Information based on query as of Friday, April 19, 2024.
Permit Information
Permit NumberBLD17-01452
StatusFinaled
Name THE RUSSELL CORPORATION
Site Address 7607 W GRATZ DR
Project NameLyle Pearson - Service Canopy
Customer Number 
ePlanReviewYes
Description
(LYLE PEARSON – FREESTANDING SERVICE CANOPY ADDITION) (DRH16-00388) (10-24-17 DRAWINGS REVISED TO ADD MORE PARKING LOT POLE LIGHTING). The existing building and the new canopy will not have a fire sprinkler system. To construct a freestanding 2,516 square foot canopy (2,167 square feet with 349 square feet of eaves) that has a total height of about 18 feet (ceiling height of about 16 feet). Site demolition work includes removing curbs, gutters, sidewalks, asphalt, light poles, etc. at the vacated portion of the former Auto Drive public way. Work is to include reinforced concrete footings, steel columns with steel base plates, a concrete slab on grade, steel girders, steel beams, steel roof deck, steel stud perimeter roof parapets, TPO single ply roof membrane installed on top of tapered foam plastic insulation, gutter, downspouts, and overflow drains. Special Inspection is required for concrete and welding. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/30/20195/1/20195/1/2019APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Bob Thornton. ok for perm occ.
BLD-Final4/22/20194/23/20194/23/2019APEND
DetailsMike Jordan
Please give me a call when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton. Pending final letter from special inspection agency.
FIRE-Final Inspection9/25/20189/25/20189/25/2018PPASS
DetailsTroy Cobbley
Life safety passed. Bob is going to install a fire exitinguisher which I will verify on next inspection.

Call me when you head this way. Phone #: ###-#### Inspection requested via web by Bob Thornton
BLD-Foundation10/31/201710/31/201710/31/2017PPASS
DetailsMike Jordan
Footing Piers. Permit Plans will be in showroom. Phone #: ###-#### Inspection requested via web by Leonard Butler
BLD-Footing10/25/201710/26/201710/26/2017APART
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Leonard Butler. Column pad footings for new canopy. No approved plans on site. Will have special inspection. Contractor to have all required documents on site for next inspection.