BLD-Final | 7/11/2018 | 7/11/2018 | 7/12/2018 | P | PASS |
Jim Sly
|
|
|
Brock Phone #: ###-####
|
DOC - Permit Finaled | 7/12/2018 | 7/12/2018 | 7/12/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Jim Sly
|
|
|
Brock Phone #: ###-#### C/N posted.
|
BLD-Final | 6/15/2018 | 6/18/2018 | 6/18/2018 | A | NR |
Mike Jordan
|
|
|
Brock Phone #: ###-####. . Needs zoning final.
|
BLD-Framing/Rough-in | 5/15/2018 | 5/15/2018 | 5/16/2018 | P | PASS |
Jim Sly
|
|
|
Brock Phone #: ###-#### Front Porch.
|
BLD-Framing/Rough-in | 2/12/2018 | 2/13/2018 | 2/13/2018 | A | FAIL |
Jim Sly
|
|
|
Russel Phone #: ###-#### C/N posted.......see corrections.....No access.
|
BLD-Framing/Rough-in | 12/13/2017 | 12/14/2017 | 12/14/2017 | A | PART |
Jim Sly
|
|
|
garage - Russell Phone #: ###-#### GARAGE OK
|
BLD-Other | 11/30/2017 | 12/1/2017 | 12/1/2017 | A | PASS |
Jim Sly
|
|
|
structural connections // Scott Phone #: ###-#### Foundation and 1st story to 2nd story connections.
|
BLD-Conference | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | PASS |
Brandon Shaw
|
|
|
Garage stem wall
|
BLD-Foundation | 10/26/2017 | 10/26/2017 | 10/26/2017 | P | CANC |
Brandon Shaw
|
|
|
Garage stem wall
|
BLD-Footing | 10/20/2017 | 10/23/2017 | 10/23/2017 | A | PART |
Jim Sly
|
|
|
Travis Phone #: ###-#### Pour at own risk........Provide full size plan.
|
BLD-Foundation | 9/21/2017 | 9/21/2017 | 9/22/2017 | P | PASS |
Jim Sly
|
|
|
Travis Phone #: ###-####
|
BLD-Footing | 9/14/2017 | 9/18/2017 | 9/18/2017 | A | PART |
Jim Sly
|
|
|
Tavis-pour time is 3:00 Phone #: ###-#### House only.....OK.
|