BLD-Final | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
FIRE-Final Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Tony Phone #: ###-####
|
BLD-Final | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | CANC |
Brandon Shaw
|
|
|
Tony Phone #: ###-####
|
FIRE-Final Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | FAIL |
Troy Cobbley
|
|
|
Replace the ceiling that has been removed for the installation of the security grill. All other corrections have been addressed.
Tony Phone #: ###-####
|
FIRE-Conference | 10/1/2019 | 10/1/2019 | 10/1/2019 | P | DONE |
Jim Page
|
|
|
Fire conference/discussion for remaining fire life safet items complete.
Tony Phone #: ###-####
|
BLD-Final | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Dave Hannah
|
|
|
Asked for Michael is Dave is out today // Tony Phone #: ###-#### ok for tco for whole building
|
BLD-Final | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | NR |
Tony Young
|
|
|
Tony Phone #: 28-###-####
|
BLD-Conference | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | NR |
Tony Young
|
|
|
if dave is not working please call to let know/reschedule // Tony Phone #: ###-####
|
FIRE-Final Inspection | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | CANC |
Jim Page
|
|
|
David Phone #: ###-#### cancel per david, wrong permit
|
BLD-Conference | 9/25/2019 | 9/25/2019 | 9/26/2019 | P | DEFR |
Tony Young
|
|
|
handrail // Tony Phone #: ###-####,, wanted Dave
|
BLD-Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PART |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Ok for temp occ. only. Verified egress system for buildings A and B. Only rooms ok for occ. are 104,107,119,120,125,138,209,210,212,217,331,337,402,405,425,427,429,432,433,440.
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, fire sprinkler inspection is complete, fire alarm system drawings need to be updated and resubmitted before final sign off due to the number of changes required to make it code compliant, fire extinguishers have been placed with current inspection tags. Remaining items to inspect for final sign off are:
1. Install permanent signage on stairwells/fire sprinkler riser room and FACP.
2. Provide inspection report for elevator inspection recall and shunt.
3. Update fire alarm drawings an resubmit for approval.
4. Change thumbturn deadbolts on sliding glass doors, level 2, to single action door hardware.
5. Provide a barrier for fall protection on roof top access ladder, stair 3. 6. Provide opening or gates in metal surround by HVAC units on roof for fireman access as discussed. 7. Hose valves on levels 1 through 4 project into the path of egress more than 4 inches, per IFC 1003.3.3, if a horizontal projection sticks out into the path of egress more than 4 inches then gaurds have to be provided if the projection doesn't impede the minimum width for the path of egress. If valves do in fact project into the path of egress, then hose valves will be required to be installed in a recessed cabinet.
45 day TCO authorized per conversation with Ron Johnson with Boise Fire Department.
David Phone #: ###-####
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
Curtis Phone #: ###-####
|
FIRE-Final Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection.
David Phone #: ###-####
|
FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | FAIL |
Troy Cobbley
|
|
|
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.
Curtis Phone #: ###-####
|
FIRE-Final Inspection | 9/16/2019 | 9/16/2019 | 9/17/2019 | P | FAIL |
Troy Cobbley
|
|
|
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.
Curtis Phone #: ###-####
|
BLD-Conference | 9/11/2019 | 9/11/2019 | 9/11/2019 | P | DONE |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
FIRE-Final Inspection | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Jim Page
|
|
|
Project not ready for life fire safety inspection, no items inspected.
Tony Phone #: ###-####
|
BLD-Final | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | CANC |
Tony Young
|
|
|
Tony Phone #: ###-####
|
BLD-Conference | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | NR |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
FIRE-Conference | 8/27/2019 | 8/27/2019 | 8/27/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete, discussed options for roof top access ladder arrangement.
Per Dave H Phone #: ###-####
|
BLD-Conference | 8/26/2019 | 8/27/2019 | 8/27/2019 | A | CANC |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
BLD-Conference | 8/22/2019 | 8/23/2019 | 8/23/2019 | A | PEND |
Dave Hannah
|
|
|
Tony Phone #: ###-#### rooftop access
|
FIRE-Conference | 8/13/2019 | 8/13/2019 | 8/13/2019 | A | DONE |
Jim Page
|
|
|
Fire conference is complete, note number 11 on building permit fire review comments mentions no parking signage being installed on the west side of 25th, west side of 25th is under a seperate permit with a different general contractor, this permit was issued after the review was completed for this project, follow up for signage will be done on the St. Lukes project which is on the west side of 25th, signage will not be required for this life fire safety inspection.
|
BLD-Conference | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | DONE |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
FIRE-Conference | 8/12/2019 | 8/12/2019 | 8/12/2019 | P | DONE |
Jim Page
|
|
|
Fire conference complete, discussed required life safety items that will need to be completed, discussed required items for possible TCO.
fire life safety // Curtis Phone #: ###-####
|
BLD-Energy code compliance | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Dave Hannah
|
|
|
Insulate breeze way Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Energy code compliance | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | NR |
Dave Hannah
|
|
|
Breeze way insulation Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Dave Hannah
|
|
|
Trash room and stair # 3 Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Dave Hannah
|
|
|
Trash rooms 2,3 and 4 Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/6/2019 | 8/6/2019 | 8/7/2019 | P | PASS |
Dave Hannah
|
|
|
Looking to cover walls Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/1/2019 | 8/1/2019 | 8/1/2019 | P | PASS |
Brandon Shaw
|
|
|
3rd Floor Common area ceiling for cover....
|
BLD-Framing/Rough-in | 7/31/2019 | 7/31/2019 | 7/31/2019 | P | PART |
Dave Hannah
|
|
|
Second and Third Floor Common areas ceiling inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner second floor ok
|
BLD-Framing/Rough-in | 7/26/2019 | 7/29/2019 | 7/29/2019 | A | PART |
Dave Hannah
|
|
|
Elevator shaft wall framing for cover, Laundry room shafts. Second Floor common area ceilings for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 7/18/2019 | 7/18/2019 | 7/18/2019 | P | PASS |
Dave Hannah
|
|
|
4th Floor Area A, B and C Corridor Ceiling inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 7/16/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Dave Hannah
|
|
|
Floors 2 and 3 area B corridor ceiling inspections for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 7/15/2019 | 7/16/2019 | 7/16/2019 | P | PASS |
Dave Hannah
|
|
|
Area C 2nd and 3rd Floor Corridor ceilings. First floor trash room and Room 106 Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 7/15/2019 | 7/16/2019 | 7/16/2019 | A | PASS |
Dave Hannah
|
|
|
Area C 2nd and 3rd Floor Corridor ceilings. First floor trash room and Room 106 Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 7/9/2019 | 7/9/2019 | 7/10/2019 | P | PART |
Dave Hannah
|
|
|
Shaft inspections. Multiple locations. Fire box inspections. Periodic inspection of Low volt boxes at 1 hr walls. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 7/2/2019 | 7/2/2019 | 7/2/2019 | P | NR |
Dave Hannah
|
|
|
1st Floor area A Drop ceiling cover inspection. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 6/27/2019 | 6/28/2019 | 6/28/2019 | A | PASS |
Mike Jordan
|
|
|
2nd and 3rd Floor Corridor ceiling inspections for cover. Sections A and D to end of corridors. Phone #: ###-#### Inspection requested via web by JT Turner. 2nd. and 3rd floor north and south corridor lids in Areas A and D ok for cover.
|
BLD-Wall cover | 6/25/2019 | 6/26/2019 | 6/26/2019 | A | NR |
Mike Jordan
|
|
|
Third Floor corridor ceiling inspection for cover. Area A and D. South to North Hallways. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 6/17/2019 | 6/18/2019 | 6/18/2019 | A | PART |
Dave Hannah
|
|
|
Laundry rooms for drywall cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 6/13/2019 | 6/14/2019 | 6/14/2019 | P | PASS |
Dave Hannah
|
|
|
4 floors of Laundry room for insulation. 2nd floor A-B drops for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | PASS |
Dave Hannah
|
|
|
Trash room inspections Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 6/6/2019 | 6/6/2019 | 6/10/2019 | P | PASS |
Dave Hannah
|
|
|
3rd Floor area A drops cover inspection. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 6/5/2019 | 6/5/2019 | 6/6/2019 | P | PART |
Dave Hannah
|
|
|
First Floor Trash Chute Rooms inspections so that we can insulate. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate east trash shut room
|
BLD-Wall cover | 6/3/2019 | 6/4/2019 | 6/4/2019 | A | PART |
Dave Hannah
|
|
|
3rd Floor area A and B drops in units for drywall cover. 2nd Floor corridor insulation and airseal areas A-B. Phone #: ###-#### Inspection requested via web by JT Turner area b ok and 2nd fl ok
|
BLD-Wall cover | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | PART |
Dave Hannah
|
|
|
Corridor Air seal. Cover inspections for Mechanical room and elevator equipment room. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate v3fl area a b corridor and ok to cover elev equip room
|
BLD-Wall cover | 5/17/2019 | 5/20/2019 | 5/21/2019 | A | PASS |
Dave Hannah
|
|
|
Elevator equipment room for cover and shaft liner on first floor of area B. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 5/15/2019 | 5/16/2019 | 5/16/2019 | P | PASS |
Dave Hannah
|
|
|
Mechanical Room cover inspection area B. First Floor area C Drop ceiling in units for cover. Air Seal 4th FLoor corridor and common areas. Elevator equipment room. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 5/13/2019 | 5/14/2019 | 5/15/2019 | P | PASS |
Dave Hannah
|
|
|
First Floor of Area A. Insulation inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 5/6/2019 | 5/7/2019 | 5/7/2019 | P | PASS |
Mike Jordan
|
|
|
3rd and 4th Floor Drop inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 5/3/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Framing/Rough-in | 5/2/2019 | 5/3/2019 | 5/3/2019 | A | PEND |
Dave Hannah
|
|
|
First floor A units inspection for insulation. First Floor corridor A for fire caulk for secondary lid. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 4/30/2019 | 5/1/2019 | 5/1/2019 | P | PASS |
Dave Hannah
|
|
|
3rd and 4th floor of Area B insulation inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 4/29/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Dave Hannah
|
|
|
Area A 3rd and 4th Floor framing inspection for insulation install. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 4/23/2019 | 4/24/2019 | 4/24/2019 | P | PASS |
Dave Hannah
|
|
|
Area B Floors 3 and 4 framing inspection for insulation install. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Dave Hannah
|
|
|
Corridors 2 and 3 in Area C inspect pre-insulation. Floor 3 of Area D chase inspection for cover. Stair 4 framing add for insulation Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Dave Hannah
|
|
|
4th Floor Area C insulation inspection for drywall cover in units. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 3/7/2019 | 3/8/2019 | 3/11/2019 | P | PASS |
Dave Hannah
|
|
|
First floor Corridor ceiling inspection for area C. From the elevator wall to the Breezeway. This is for ceiling pre-rock. Phone #: ###-#### Inspection requested via web by JT Turner
|
FIRE-Conference | 2/18/2019 | 2/19/2019 | 2/19/2019 | P | DONE |
Jim Page
|
|
|
Fire conference comlete.
Adare Manor Fire inspector Consult. Extinguisher locations, draft stopping, Knox box, etc. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 2/18/2019 | 2/19/2019 | 2/19/2019 | P | PART |
Dave Hannah
|
|
|
Balcony framing on north face of building for siding/soffit cover Phone #: ###-#### Inspection requested via web by JT Turner all but the south end second fl and the north end 4th floor ok to insulate
|
BLD-Framing/Rough-in | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | NR |
Dave Hannah
|
|
|
Shear inspection remaining corridors floors 1-4. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 2/6/2019 | 2/6/2019 | 2/7/2019 | P | PART |
Dave Hannah
|
|
|
Floors 2 and 3 corridor fire caulking inspection so that we can begin insulation and drywall. Area D. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate and pre rpck corradoers 2nd and 3rd floors bldg d
|
BLD-Wall Bracing | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
BLD-Energy code compliance | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PART |
Dave Hannah
|
|
|
Tony Phone #: ###-#### elec rooms
|
BLD-Energy code compliance | 1/17/2019 | 1/18/2019 | 1/18/2019 | A | PART |
Dave Hannah
|
|
|
Tony Phone #: ###-#### shafts north bldg ok to cover three sides
|
BLD-Conference | 1/16/2019 | 1/17/2019 | 1/17/2019 | P | DONE |
Dave Hannah
|
|
|
Tony- please call 1st Phone #: ###-####
|
BLD-Other | 12/26/2018 | 12/27/2018 | 12/27/2018 | P | PASS |
Dave Hannah
|
|
|
Roof nailing inspection. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ok to cover roof
|
BLD-Other | 12/20/2018 | 12/26/2018 | 12/27/2018 | P | PASS |
Dave Hannah
|
|
|
Roof nailing inspection at northeast corner. Shear nailing inspection on north and south walls of area B and C. Phone #: ###-#### Inspection requested via web by Corey Hockersmith ext shear ok
|
BLD-Wall Bracing | 12/18/2018 | 12/20/2018 | 12/20/2018 | P | PASS |
Dave Hannah
|
|
|
Exterior shear and strapping north and south side of north wing (our B and C buildings). Phone #: ###-#### Inspection requested via web by Corey Hockersmith
|
BLD-Other | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PASS |
Dave Hannah
|
|
|
roof shear // tony Phone #: ###-####
|
BLD-Wall Bracing | 11/20/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Jim Storey
|
|
|
shear // Tony Phone #: ###-#### 3rd exterior a and e ok
|
BLD-Wall Bracing | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PART |
Jim Sly
|
|
|
interior // Tony Phone #: ###-#### Inspection of retro fit hold downs area A B and C. All OK except 3 in area C (marked in orange). and.........4 in front wall of elevator shaft. MTI special inspections.
|
BLD-Wall Bracing | 11/6/2018 | 11/6/2018 | 11/7/2018 | P | PART |
Dave Hannah
|
|
|
shear // Tony Phone #: ###-#### ext 2nd and third floors blg b and c
|
FIRE-Conference | 10/25/2018 | 10/26/2018 | 10/26/2018 | A | CANC |
Jim Page
|
|
|
Phone number provided is not in service, conference will need to be rescheduled with correct point of contact information, this conference request is cancelled.
Mike Phone #: ###-####
|
BLD-Energy code compliance | 10/25/2018 | 10/26/2018 | 10/26/2018 | P | NR |
Dave Hannah
|
|
|
1st and 2nd floor section BC // Mike Phone #: ###-####
|
BLD-Wall Bracing | 10/11/2018 | 10/12/2018 | 10/11/2018 | A | PART |
Jim Sly
|
|
|
mike Phone #: ###-#### Wing A.....Exterior and interior shear nailing ........strapping ...1st and 2nd floor.
|
BLD-Wall Bracing | 10/8/2018 | 10/10/2018 | 10/11/2018 | P | NR |
Dave Hannah
|
|
|
Mike-exterior strap & shear Phone #: ###-####
|
BLD-Wall Bracing | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PASS |
Dave Hannah
|
|
|
Mike-plywood shear interior Phone #: ###-####
|
BLD-Wall Bracing | 10/3/2018 | 10/4/2018 | 10/4/2018 | P | CANC |
Brandon Shaw
|
|
|
NW restaurant walls // Mike Parker Phone #: ###-####
|
BLD-Conference | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | DONE |
Dave Hannah
|
|
|
2hr walls/plumbing - Tony Phone #: ###-####
|
BLD-Wall Bracing | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | NR |
Dave Hannah
|
|
|
shear wall, late morning - Tony Phone #: ###-####
|
BLD-Wall Bracing | 8/29/2018 | 8/30/2018 | 8/30/2018 | A | PART |
Dave Hannah
|
|
|
1st fl - Tony Phone #: ###-#### see plans for areas inspected for shear ok to pre rx
|
BLD-Conference | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | DONE |
Dave Hannah
|
|
|
Tony-or Mike ###-#### Phone #: ###-####
|