BLD-Final | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
FIRE-Final Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
Tony Phone #: ###-####
|
BLD-Final | 10/16/2019 | 10/17/2019 | 10/17/2019 | P | CANC |
Brandon Shaw
|
|
|
Tony Phone #: ###-####
|
FIRE-Final Inspection | 10/16/2019 | 10/17/2019 | 10/17/2019 | A | PASS |
Troy Cobbley
|
|
|
Previous corrections have been addressed. Life safety passed. Tony Phone #: ###-####
|
BLD-Final | 9/27/2019 | 9/30/2019 | 9/30/2019 | A | PART |
Dave Hannah
|
|
|
Asked for Michael is Dave is out today // Tony Phone #: ###-#### ok for tco for whole building
|
BLD-Final | 9/27/2019 | 9/27/2019 | 9/27/2019 | P | NR |
Tony Young
|
|
|
Tony Phone #: 28-###-####
|
FIRE-Final Inspection | 9/26/2019 | 9/27/2019 | 9/27/2019 | A | CANC |
Jim Page
|
|
|
David Phone #: ###-#### cancel per david wrong permit
|
BLD-Final | 9/19/2019 | 9/20/2019 | 9/20/2019 | A | PART |
Mike Jordan
|
|
|
Tony Phone #: ###-####. Ok for temp occ. only. Verified egress system for buildings A and B. Only rooms ok for occ. are 104,107,119,120,125,138,209,210,212,217,331,337,402,405,425,427,429,432,433,440.
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | A | PART |
Jim Page
|
|
|
Partial final inspection for life fire safety complete, fire sprinkler inspection is complete, fire alarm system drawings need to be updated and resubmitted before final sign off due to the number of changes required to make it code compliant, fire extinguishers have been placed with current inspection tags. Remaining items to inspect for final sign off are:
1. Install permanent signage on stairwells/fire sprinkler riser room and FACP.
2. Provide inspection report for elevator inspection recall and shunt.
3. Update fire alarm drawings an resubmit for approval.
4. Change thumbturn deadbolts on sliding glass doors, level 2, to single action door hardware.
5. Provide a barrier for fall protection on roof top access ladder, stair 3. 6. Provide opening or gates in metal surround by HVAC units on roof for fireman access as discussed. 7. Hose valves on levels 1 through 4 project into the path of egress more than 4 inches, per IFC 1003.3.3, if a horizontal projection sticks out into the path of egress more than 4 inches then gaurds have to be provided if the projection doesn't impede the minimum width for the path of egress. If valves do in fact project into the path of egress, then hose valves will be required to be installed in a recessed cabinet.
45 day TCO authorized per conversation with Ron Johnson with Boise Fire Department.
|
FIRE-Final Inspection | 9/17/2019 | 9/18/2019 | 9/18/2019 | P | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
Curtis Phone #: ###-####
|
FIRE-Final Inspection | 9/17/2019 | 9/17/2019 | 9/17/2019 | P | CANC |
Troy Cobbley
|
|
|
Duplicate inspection.David Phone #: ###-####
|
FIRE-Final Inspection | 9/16/2019 | 9/17/2019 | 9/17/2019 | A | FAIL |
Troy Cobbley
|
|
|
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.
Curtis Phone #: ###-####
|
FIRE-Final Inspection | 9/16/2019 | 9/16/2019 | 9/17/2019 | P | FAIL |
Troy Cobbley
|
|
|
See the Fire Life Safety Plan Review Comments for items marked in red that need addressed which include finishing the fire alarm permit (added notification devices/elevator testing), fire dept access signage, additional fire extinguishers in common areas such as Laundry Rooms/Mail Rooms/Mechanical Rooms, Single action hardware for the common use rooms with sliding doors, verification that the Riser Room is one hour.....ect.
Curtis Phone #: ###-####
|
FIRE-Final Inspection | 8/29/2019 | 8/30/2019 | 8/30/2019 | A | FAIL |
Jim Page
|
|
|
Project not ready for life fire safety inspection, no items inspected.
Tony Phone #: ###-####
|
BLD-Final | 8/29/2019 | 8/30/2019 | 8/30/2019 | P | CANC |
Tony Young
|
|
|
Tony Phone #: ###-####
|
BLD-Conference | 8/29/2019 | 8/29/2019 | 8/29/2019 | P | NR |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
BLD-Energy code compliance | 8/16/2019 | 8/19/2019 | 8/19/2019 | A | PASS |
Dave Hannah
|
|
|
Insulation on joist in ceiling of retail space. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 8/12/2019 | 8/13/2019 | 8/13/2019 | A | PASS |
Dave Hannah
|
|
|
Looking at the retail area and elevator hold downs. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Energy code compliance | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Dave Hannah
|
|
|
Insulation in breeze way Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Energy code compliance | 8/8/2019 | 8/8/2019 | 8/8/2019 | P | NR |
Dave Hannah
|
|
|
Breezeway insulation Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Dave Hannah
|
|
|
Trash rooms Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/7/2019 | 8/7/2019 | 8/7/2019 | P | PASS |
Dave Hannah
|
|
|
Trash rooms 2,3 and 4 Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 8/6/2019 | 8/6/2019 | 8/7/2019 | P | PASS |
Dave Hannah
|
|
|
Looking to cover walls Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 7/10/2019 | 7/11/2019 | 7/11/2019 | A | PASS |
Mike Jordan
|
|
|
4th Floor Area D Corridor Ceiling inspection for drywall cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 5/30/2019 | 5/30/2019 | 5/30/2019 | A | PASS |
Dave Hannah
|
|
|
4th Floor Area A and B Soffit Cover inspection. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 5/2/2019 | 5/2/2019 | 5/2/2019 | P | PASS |
Dave Hannah
|
|
|
Second Floor Area D Soffit inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 4/25/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Dave Hannah
|
|
|
4th Floor Area D soffit areas for drywall cover. Stairway 3 and Mailroom for drywall cover. 2nd Floor B insulation inspection for cover. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Wall cover | 4/17/2019 | 4/17/2019 | 4/17/2019 | A | PASS |
Jim Sly
|
|
|
3rd Floor of area D Soffit inspection from cover. Phone #: ###-#### Inspection requested via web by JT Turner Additional inspection of firestopping in soffits 2nd floor units.......OK.
|
BLD-Conference | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | CANC |
Dave Hannah
|
|
|
|
BLD-Wall cover | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | PASS |
Dave Hannah
|
|
|
Inspection of Area D floors 2-3. Janitors, Trash and storage rooms on south end. Inspection so that we can insulate. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Energy code compliance | 4/10/2019 | 4/11/2019 | 4/11/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084076523 >> Inspection requested via mobile web by Travis Blackburn
|
BLD-Energy code compliance | 4/9/2019 | 4/10/2019 | 4/10/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 4th floor area c ok and ok to insulate first floor
|
BLD-Wall cover | 4/4/2019 | 4/5/2019 | 4/5/2019 | A | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver
|
BLD-Wall cover | 4/3/2019 | 4/4/2019 | 4/4/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver first floor drop ceilings bld b ok to cover
|
BLD-Energy code compliance | 4/3/2019 | 4/3/2019 | 4/4/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver area c third floor ok to insulate
|
BLD-Energy code compliance | 4/2/2019 | 4/3/2019 | 4/3/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 3rd floor area c ok to insulate
|
BLD-Wall cover | 3/29/2019 | 4/1/2019 | 4/1/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver second floor area c ok to cover
|
BLD-Wall cover | 3/28/2019 | 3/29/2019 | 3/29/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver area c first floor units ok to cover
|
BLD-Wall cover | 3/26/2019 | 3/27/2019 | 3/28/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver
|
BLD-Wall cover | 3/20/2019 | 3/21/2019 | 3/22/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 4th floor bldg d ok
|
BLD-Framing/Rough-in | 3/19/2019 | 3/19/2019 | 3/20/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver shear and hold downs ground level 1st floor
|
BLD-Wall cover | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver 3rd floor insulation bldg d
|
BLD-Wall cover | 3/12/2019 | 3/12/2019 | 3/14/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver
|
BLD-Wall cover | 3/13/2019 | 3/13/2019 | 3/14/2019 | P | PASS |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver bldg d second floor ok
|
BLD-Wall cover | 3/7/2019 | 3/8/2019 | 3/11/2019 | P | CANC |
Dave Hannah
|
|
|
Second Floor Area D Full cover inspection of units. Third and fourth floor of area D for main shear wall fire caulk inspection so that we can finish shear. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 3/5/2019 | 3/6/2019 | 3/6/2019 | A | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver first floor sear wall at 2hr wall ok to cover ok to insulate second floor
|
BLD-Framing/Rough-in | 2/28/2019 | 3/1/2019 | 3/1/2019 | P | PART |
Brandon Shaw
|
|
|
1st floor shear framing, Ok to insulate... 2nd floor corridors, areas A, B, and C, OK to Insulate...
|
BLD-Framing/Rough-in | 2/25/2019 | 2/25/2019 | 2/25/2019 | P | PART |
Mike Jordan
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver. 2nd floor, Area D, ok to insulate exterior walls only. 1st. floor Area D, ok to insulate interior walls and rock from ceiling down 4ft except at 2hr. wall.
|
BLD-Wall cover | 2/22/2019 | 2/22/2019 | 2/22/2019 | P | PART |
Dave Hannah
|
|
|
Phone #: 2084018528 >> Inspection requested via mobile web by Gary Oliver insulation ceiling and ext walls on rooms 134 -141
|
BLD-Framing/Rough-in | 2/20/2019 | 2/20/2019 | 2/20/2019 | P | PART |
Dave Hannah
|
|
|
Area D First Floor unit ceilings for insulation and drywall cover. Exterior walls as well. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate ext walls and ceiling bldg d
|
FIRE-Conference | 2/12/2019 | 2/13/2019 | 2/13/2019 | A | CANC |
Troy Cobbley
|
|
|
Overall expectations project walk. Fire Extinguishers, Knox boxes, system setup, etc. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 2/12/2019 | 2/12/2019 | 2/12/2019 | P | NR |
Dave Hannah
|
|
|
Shear inspection remaining corridors floors 1-4. Phone #: ###-#### Inspection requested via web by JT Turner
|
BLD-Framing/Rough-in | 2/6/2019 | 2/6/2019 | 2/7/2019 | P | PART |
Dave Hannah
|
|
|
Floors 2 and 3 corridor fire caulking inspection so that we can begin insulation and drywall. Area D. Phone #: ###-#### Inspection requested via web by JT Turner ok to insulate and pre rpck corradoers 2nd and 3rd floors bldg d
|
BLD-Wall Bracing | 1/29/2019 | 1/30/2019 | 1/30/2019 | P | PASS |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
BLD-Wall Bracing | 12/13/2018 | 12/13/2018 | 12/13/2018 | P | PASS |
Dave Hannah
|
|
|
shear // Tony Phone #: ###-####
|
BLD-Wall Bracing | 11/20/2018 | 11/21/2018 | 11/21/2018 | P | PASS |
Jim Storey
|
|
|
shear // Tony Phone #: ###-#### 3rd exterior a and e ok
|
BLD-Wall Bracing | 11/6/2018 | 11/7/2018 | 11/7/2018 | A | PART |
Jim Sly
|
|
|
interior // Tony Phone #: ###-####Walked with Gary.........Inspection of all retro fit hold downs in area A B and C. all OK except 3 missing in area C ......(marked in orange) and front wall of Elevator shaft. MTI special inspections
|
BLD-Wall Bracing | 10/8/2018 | 10/9/2018 | 10/9/2018 | A | PART |
Dave Hannah
|
|
|
Mike Phone #: ###-####-plywood shear interior
|
BLD-Wall Bracing | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | PART |
Dave Hannah
|
|
|
tony Phone #: ###-#### see plans for areas oked
|
BLD-Framing/Rough-in | 10/1/2018 | 10/2/2018 | 10/2/2018 | A | NR |
Dave Hannah
|
|
|
tony Phone #: ###-####
|
BLD-Wall Bracing | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | PART |
Dave Hannah
|
|
|
Tony Phone #: ###-####
|
BLD-Conference | 8/3/2018 | 8/3/2018 | 8/3/2018 | P | DONE |
Dave Hannah
|
|
|
Tony-or Mike ###-#### Phone #: ###-####
|