BLD-Final | 10/19/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Jim Sly
|
|
|
OK for Perm Occ.
|
FIRE-Final Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Jim Page
|
|
|
Fire sprinkler modifications are complete (FIR17-00580). Final life fire safey inspection passed/complete.
|
BLD-Final | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Jim Sly
|
|
|
Call half hour before to meet late afternoon if possible // Dan Phone #: ###-#### OK for Temp Occ. OK for Perm Occ. when Fire/ Sprinkler signs off for Perm Occ.
|
FIRE-Final Inspection | 10/5/2017 | 10/5/2017 | 10/5/2017 | P | PART |
Jim Page
|
|
|
No fire alarm modifications, fire extinguishers are in place with current inspection tags, commercial hood fire suppression system has a current inspection tag. TCO for life fire safety authorized for 21 days per conversation with Scott Arellano pending fire sprinkler work.
|
FIRE-Final Inspection | 10/2/2017 | 10/3/2017 | 10/3/2017 | A | CANC |
Jim Page
|
|
|
FIR permit needs to be received for fire sprinkler work before a TCO can be authorized, this inspection request is cancelled.
|
FIRE-Final Inspection | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | FAIL |
Jim Page
|
|
|
Provide means of egress illumination to include exit discharge per note number 13 of the building permit fire code plan review. Slide bolt located on north exit door must be removed (note number 10), screen door on north exit must be removed, door does not swing with the path of travel. Round type door hardware must be replaced with single action lever type hardware. Provide modifications to the fire sprinkler system (note number 1), sprinkler heads in cooking area need to be replaced due to excessive external loading, fire sprinkler head needs to be added in main entry vestibule. Maximum occupancy placard needs to be placed in seating area as per note number 9.
|
BLD-Framing/Rough-in | 9/5/2017 | 9/5/2017 | 9/5/2017 | P | PART |
Jim Sly
|
|
|
call for lock box code // Dan Phone #: ###-#### Framing OK.......Still need plumbing R/ I approval.
|
BLD-Conference | 8/29/2017 | 8/29/2017 | 8/29/2017 | P | PASS |
Dave Hannah
|
|
|
call 20min before/ early pm please/ Dan Phone #: ###-####
|