Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD17-03023
StatusFinaled
Name MATT PHILLIPS
Site Address 10481 W FAIRVIEW AVE
Project NameVector Church - TI
Customer Number 
ePlanReviewYes
Description
(VECTOR CHURCH – DEATHPROOF COFFEE -- TENANT IMPROVEMENT – OLD KMART – EAST END) (CZC17-00130) (2-28-18 DEFERRED SUBMITTAL TO CONSTRUCT THE 914 SQUARE FOOT WORSHIP PLATFORM, THE 200 SQUARE FOOT ADJACENT PLATFORM, AND THE 111 SQUARE FOOT SOUND BOOTH PLATFORM. ALL PLATFORMS WILL BE 30 INCHES TALL AND WILL BE PERMANENT. WORK INCLUDES WOOD STUD PONY WALLS, WOOD FLOOR JOISTS, WOOD FLOOR DECKING, A WOOD FRAMED RAMP, WOOD FRAMED STAIRWAYS, AND ADEQUATE BRACING IN BOTH DIRECTIONS TO RESIST LATERAL LOADS. THE CONCEALED COMBUSTIBLE SPACES BELOW THE PLATFORMS ARE REQUIRED TO BE IN COMPLIANCE WITH NFPA 13 (I.E. THE FIRE SPRINKLER STANDARD). The fire sprinkler system is used for unlimited area of the building AND to allow 3-hr fire barrier walls in lieu of fire walls. The fire sprinkler system is NOT allowed to be used for building area increase for A Occupancies. To do tenant improvement work inside a 12,633 square foot tenant space for a new church. This tenant space was created under shell permit BLD17-01449. Work is to include a coffee bar, coffee preparation equipment, a gypsum board soffit, interior nonbearing walls, interior doors, a shear wall at the edge of an existing mezzanine where a portion of the mezzanine was removed, structural upgrades to the remaining mezzanine diaphragm in the adjacent space, suspended acoustical ceiling, millwork, and finishes. A new 30.67 foot wide opening and a new 6.33 foot wide opening will be created in an existing interior masonry bearing wall. Work is to include expanded concrete footings, steel columns, steel beam, and steel headers and jambs. Special Inspection is required for anchors post-installed in hardened concrete and for welding. Some building shell work was done under permit BLD17-01449. Work included structural modifications to the roof (beams and joists) to support new roof top HVAC equipment, new openings in the North exterior masonry bearing wall with a new 2-hr steel beam or lintel supported by new 2-hr steel columns or jambs and expanded concrete footings, new storefront glazing and entrance doors, 3-hr fire barrier walls per the 2012 IEBC in lieu of fire walls to create separate buildings, 3-hr exit doors in the fire barrier wall, interior nonbearing walls, and 2 toilet rooms accessible to the disabled. Modular stage, modular ramp, modular sound room, and modular stairways, are deferred submittal items and are required to be reviewed and approved before installation. This permit is intended to establish a Certificate of Occupancy for this tenant. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/15/20186/15/20186/15/2018PPASS
DetailsMike Jordan
Please call ahead for access -Matt Phone #: ###-####. Ok for perm occ. No card on site to sign.
FIRE-Final Inspection6/12/20186/12/20186/12/2018PPASS
DetailsTroy Cobbley
Life safety passed

Matt Phone #: ###-####
BLD-Final5/22/20185/23/20185/23/2018ACANC
DetailsMike Jordan
Matt- call beforehand Phone #: ###-####
BLD-Conference5/23/20185/23/20185/23/2018ADONE
DetailsMike Jordan
Matt- call beforehand Phone #: ###-####. Walk through prior to final.
FIRE-Conference3/27/20183/27/20183/27/2018PDONE
DetailsTroy Cobbley
The Main Stage and the Audio/Visual Stage have both been filled with insulation and now will not require fire sprinkler protection.

Matt Phone #: ###-####
FIRE-Conference3/16/20183/19/20183/19/2018PDONE
DetailsTroy Cobbley
Matt and I discussed filling the spaces under the main platform and the audio/visual control area. We also discussed the apparent need for a manual fire alarm system as based on the review comments and the occupant load/fire alarm requirements in the IFC for an A-3 occupancy.


Matt Phone #: ###-####
BLD-Framing/Rough-in3/16/20183/16/20183/16/2018PPASS
DetailsMike Jordan
Matt Phone #: ###-####.. Framing for stage and sound booth ok. Advised tenant to schedule a fire conferance to discuss NFPA 13 as it petains to the area under the sound booth and stage.
BLD-Framing/Rough-in2/20/20182/20/20182/20/2018PPASS
DetailsMike Jordan
Matt Phone #: ###-####. Interior wood framed walls and soffit and coffee bar north of fire barier ok.
BLD-Conference1/18/20181/22/20181/22/2018ADONE
DetailsMike Jordan
Matt Phone #: ###-####