Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD17-03210
StatusFinaled
Name HOBSON FABRICATING CORP
Site Address 4701 S NORTHRUP ST
Project NameValley Regional Transit
Customer Number 
ePlanReviewYes
Description
(VALLEY REGIONAL TRANSIT – GAS DETECTION & HVAC SYSTEM) ***Note: Deferred submittals of the engineering calculation for the new exterior MAU concrete pad, DO NOT FINAL until engineering calculation are submitted and approved for the new exterior MAU concrete pad. *** Permit to redesign the gas detection system and the HVAC system within the existing Bus Maintenance Facility. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of existing gas detection system, removal of HVAC equipment, new mechanical equipment and ductwork, new exterior concrete pad for new MAU, new gas detection system, select shop light fixture relocation, electrical work, plumbing work and mechanical work. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/18/20202/19/20202/19/2020ADONE
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/17/20202/18/20202/18/2020APASS
DetailsTroy Cobbley
Life safety passed.

Fire Life Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/14/20202/14/20202/14/2020PFAIL
DetailsTroy Cobbley
The engineer's details for the notification height state the device is to be mounted between 80" and 96". All of the devices have been mounted above the stated limits.


Life safety Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
FIRE-Final Inspection2/12/20202/13/20202/13/2020AFAIL
DetailsTroy Cobbley
Provide city approved plans and the letter from the engineer as discussed for the gas system.

Ryan Phone #: ###-####
BLD-Final2/10/20202/10/20202/11/2020PNR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Final2/7/20202/10/20202/11/2020ANR
DetailsJim Storey
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth
BLD-Aging Inspection1/27/20201/27/20201/27/2020 NR
DetailsJim Storey
425
BLD-Final12/17/201912/18/201912/18/2019ANR
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Amanda Farnsworth