Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD17-03263
StatusFinaled
Name STOCK CONSTRUCTION MANAGEMENT
Site Address 8000 S FEDERAL WAY
Project NameC24074 B51 R & D Ped Link
Customer NumberC24074
ePlanReviewYes
Description
(MICRON PEDESTRIAN LINK) Construct a pedestrian link above grade to connect the second floor of the existing B36 space with the second floor (Level 30) of the new B51 R & D Expansion Project. The pedestrian link is to be fully fire sprinklered. CDM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/17/201910/17/201910/17/2019ADONE
DetailsJim Storey
All associated permits have been finaled. Supporting documentation from architect, engineer and special inspector has been provided and attached for building code required inspections not performed by Boise City.
DOC - Permit Finaled  10/17/2019 DONE
BLD-Aging Inspection10/10/201910/10/201910/10/2019 PASS
DetailsJim Storey
need jblais to respond . exp 2/20/19
BLD-Aging Inspection10/9/201910/9/201910/9/2019 PEND
DetailsJim Storey
need jblais to respond . exp 2/20/19
BLD-Final5/29/20195/30/20195/30/2019ANR
DetailsJim Storey
need jblais to respond .
BLD-Final5/24/20195/28/20195/29/2019PDEFR
DetailsBrandon Shaw
Dillon Phone #: ###-####
FIRE-Final Inspection5/24/20195/28/20195/28/2019APASS
DetailsJim Page
Fire sprinkler inspection for area of worki has been completed, fire alarm inspection for area of work completed, fire extinguishers are in common areas with current inspection tags. Final life fire safety inspection for B51 pedestrian link complete.

Dillon Phone #: ###-####
BLD-Conference4/3/20194/3/20194/3/2019APEND
DetailsJim Storey
Expires: 02/20/19
BLD-Aging Inspection8/24/20188/24/20188/24/2018 PASS
DetailsJim Storey
Joel hartman Phone #: ###-#### // si, arch & engineers reports supplied to bo jason blais for aproval work performed without permits and insp. by building insp.//fire spk/alrm and life saftey to be performed before occupance and use.// building 51 not aproved for exting no occupance allowed.
BLD-Aging Inspection8/23/20188/23/20188/23/2018 FAIL
DetailsJim Storey
Joel hartman Phone #: ###-#### // si, arch & engineers reports supplied to bo jason blais for aproval work performed without permits and insp. by building insp.//fire spk/alrm and life saftey to be performed before occupance and use.// building 51 not aproved for exting no occupance allowed.
BLD-Final4/9/20184/11/20184/11/2018PFAIL
DetailsJim Storey
Joel hartman Phone #: ###-#### // si, arch & engineers reports supplied to bo jason blais for aproval work performed without permits and insp. by building insp.//fire spk/alrm and life saftey to be performed before occupance and use.// building 51 not aproved for exting no occupance allowed.
BLD-Wall cover3/23/20183/26/20183/26/2018AFAIL
DetailsJim Storey
Call or text either one is fine. Thank you. Phone #: ###-#### Inspection requested via web by BJ Nava
c/n grout under bearing plates/arch and stuc engineer to verivy built per city aproved plans submit letters to bo for aproval.// need fire alarm , spk and mech permits/ provide exption to envlope to meet engery code.// r30? stairs to reinspect