BLD-Final | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | PASS |
Mike Jordan
|
|
|
Curt Phone #: ###-#### or Justin ###-####. OK for temp occ. Will be ok for perm occ. once zoning signs perm.
|
BLD-Final | 3/21/2018 | 3/22/2018 | 3/22/2018 | P | CANC |
Mike Jordan
|
|
|
Kurt Phone #: ###-####. Wrong entry. Inspection has been rescheduled.
|
BLD-Conference | 3/22/2018 | 3/22/2018 | 3/22/2018 | P | CANC |
Mike Jordan
|
|
|
|
FIRE-Final Inspection | 3/20/2018 | 3/21/2018 | 3/21/2018 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
request first thing in AM // Justin Boyer Phone #: ###-####
|
FIRE-Final Inspection | 3/16/2018 | 3/19/2018 | 3/19/2018 | P | FAIL |
Troy Cobbley
|
|
|
Remove the dead bolt on the door between dining and the playland area and also install an exit sign as per the plans, mount the fire extinguisher in the Playland area, repair the two emergency lights in the Kitchen area and finish installing the exit discharge light out the back Kitchen door, install the Occupant Load signs (two). The hood suppression and fire extinguishers are current with inspections.
Justin Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PART |
Brandon Shaw
|
|
|
OK for perimeter cover,
|
BLD-Ceiling Grid Inspection | 3/8/2018 | 3/8/2018 | 3/8/2018 | P | PASS |
Mike Jordan
|
|
|
Justin Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 3/1/2018 | 3/2/2018 | 3/2/2018 | A | PART |
Brandon Shaw
|
|
|
Partial for playland area- OK to cover perimeter only
|
BLD-Framing/Rough-in | 2/23/2018 | 2/26/2018 | 2/26/2018 | A | PASS |
Mike Jordan
|
|
|
justin Phone #: ###-####. Interior steel stud framed walls and hardlid for restrooms.
|
BLD-Framing/Rough-in | 2/22/2018 | 2/23/2018 | 2/23/2018 | P | NR |
Mike Jordan
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 2/12/2018 | 2/13/2018 | 2/13/2018 | A | PASS |
Mike Jordan
|
|
|
Justin Phone #: ###-####. Remainder of exterior band ok. Also new kicker wall for parapet ok.
|
BLD-Framing/Rough-in | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PART |
Dave Hannah
|
|
|
Justin-partial Phone #: ###-#### ok to cover ext band around building also ok to cover parapet
|
BLD-Footing | 2/8/2018 | 2/9/2018 | 2/9/2018 | A | PASS |
Dave Hannah
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 2/2/2018 | 2/5/2018 | 2/5/2018 | A | PASS |
Mike Jordan
|
|
|
Justin Phone #: ###-####. Parapet exetesion framing ok.
|