BLD-Final | 9/5/2018 | 9/6/2018 | 9/6/2018 | A | PASS |
Dave Hannah
|
|
|
Please call 5 minutes before on site. Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Final | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen ok for temp occ ok for perm after public works gos perm
|
FIRE-Final Inspection | 7/12/2018 | 7/13/2018 | 7/13/2018 | A | PASS |
Jim Page
|
|
|
Fire sprinkler inspection complete, fire alarm inspection complete, fire extinguishers are in place with current inspection tags. Final life fire safety inspection complete.
Phone #: ###-#### Inspection requested via web by Philip Allen
|
FIRE-Final Inspection | 7/11/2018 | 7/12/2018 | 7/12/2018 | P | CANC |
Jim Page
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
BLD-Final | 7/11/2018 | 7/12/2018 | 7/12/2018 | P | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
BLD-Final | 7/5/2018 | 7/6/2018 | 7/6/2018 | P | PEND |
Dave Hannah
|
|
|
Requesting TCO for training purposes- Please call when on site. Phone #: ###-#### Inspection requested via web by Philip Allen ok to stock kitchen and train staff.
|
FIRE-Final Inspection | 7/5/2018 | 7/5/2018 | 7/5/2018 | A | PART |
Jim Page
|
|
|
Partial final life fire safety inspection for TCO complete. Fire extinguishers are in place, fire sprinkler permit is still in issued status and will remain in issued status until underground supply is repaired, fire alarm permit will remain in issued status until fire sprinkler system is made active, fire alarm system is for fire sprinkler riser monitoring and cannot be completed until fire sprinklers are made active. TCO is authorized for 30 days per conversation with Jason Blais, TCO is for employee training only, TCO is also contigent on a 24 hour fire watch, a 24 hour fire watch is REQUIRED until fire sprinkler/fire alarm inspections are complete and finaled.
|
FIRE-Final Inspection | 7/2/2018 | 7/3/2018 | 7/3/2018 | P | FAIL |
Jim Page
|
|
|
FIre sprinkler inspection is not complete, building is in no way ready for life fire safety inspection.
No personnel other that construction personnel inside of building until life fire safety inspection is complete.
Please call Phil when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Conference | 6/28/2018 | 6/29/2018 | 6/29/2018 | P | DONE |
Dave Hannah
|
|
|
Please call when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
|
FIRE-Conference | 6/28/2018 | 6/28/2018 | 6/28/2018 | P | DONE |
Jim Page
|
|
|
Fire conference complete.
Please call Phil Allen at Phone number listed when on site. Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Ceiling Grid Inspection | 6/25/2018 | 6/26/2018 | 6/26/2018 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen pending trades aproval// ceilling ok to cover
|
BLD-Conference | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | DONE |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen. Concern with landing from south exit to public way.. less than 2% slope to sidewalk.
|
BLD-Conference | 6/12/2018 | 6/12/2018 | 6/12/2018 | P | DONE |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Ceiling Grid Inspection | 5/16/2018 | 5/17/2018 | 5/17/2018 | P | PASS |
Jim Storey
|
|
|
Hard Lids above Bakery ; Dining Soffits Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Wall cover | 5/8/2018 | 5/9/2018 | 5/9/2018 | A | PASS |
Dave Hannah
|
|
|
Interior walls. Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Energy code compliance | 5/1/2018 | 5/1/2018 | 5/1/2018 | P | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Wall cover | 4/30/2018 | 5/1/2018 | 5/1/2018 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Footing | 4/27/2018 | 4/30/2018 | 4/30/2018 | A | PEND |
Brandon Shaw
|
|
|
Exterior Drive Thru Trellis Footing Pending Special Inspection approval
|
BLD-Framing/Rough-in | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PASS |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Framing/Rough-in | 4/25/2018 | 4/26/2018 | 4/26/2018 | A | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Allen wrong day requisted rolled to fri 27
|
BLD-Conference | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | NR |
Dave Hannah
|
|
|
Exterior wall insulate ; cover Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Framing/Rough-in | 4/17/2018 | 4/18/2018 | 4/18/2018 | A | PART |
Dave Hannah
|
|
|
Inspection requested via web by Philip Allen roof sheating ok after mti sign off
|
BLD-Framing/Rough-in | 4/17/2018 | 4/18/2018 | 4/17/2018 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|
BLD-Concrete | 3/19/2018 | 3/20/2018 | 3/22/2018 | P | DONE |
Dave Hannah
|
|
|
Building Slab On Grade Prep, Vapor Barrier, Rebar... Special Inspector scheduled as well. Phone #: ###-#### Inspection requested via web by Philip Allen covered by spec inspection
|
BLD-Footing | 2/27/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Dave Hannah
|
|
|
Special Inspector scheduled as well Phone #: ###-#### Inspection requested via web by Philip Allen
|
BLD-Footing | 2/27/2018 | 2/28/2018 | 2/27/2018 | P | CANC |
Dave Hannah
|
|
|
Special Inspector scheduled as well Phone #: ###-#### >> Inspection requested via web by Philip Allen Inspection cancelled from web by: Philip Allen
|