BLD-Final | 9/6/2018 | 9/6/2018 | 9/6/2018 | P | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-####
|
BLD-Final | 9/4/2018 | 9/4/2018 | 9/4/2018 | P | NR |
Jim Sly
|
|
|
Chris Phone #: ###-#### Need Zoning final
|
FIRE-Final Inspection | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
Chris Phone #: ###-####
|
FIRE-Final Inspection | 8/28/2018 | 8/28/2018 | 8/28/2018 | P | FAIL |
Troy Cobbley
|
|
|
Provide small documents, provide exit discharge lighting at Door #2, remove the tape and shipping clip from sprinkler in Storage Room, provide hardware for the glass double doors, provide modified plans that show the actual installation or walls, provide occupant load sign in the approved location.
|
BLD-Framing/Rough-in | 6/15/2018 | 6/18/2018 | 6/18/2018 | P | PART |
Mike Jordan
|
|
|
Micheal Phone #: ###-####. grid ok, pending fire sprinkler rough in and electrical at back room.
|
BLD-Framing/Rough-in | 6/11/2018 | 6/12/2018 | 6/12/2018 | P | NR |
Mike Jordan
|
|
|
Michael, request before 3:30PM Phone #: ###-####. Grid inspection. Needs MEP's and fire sprinkler rough in inspections first.
|
BLD-Framing/Rough-in | 5/21/2018 | 5/22/2018 | 5/23/2018 | P | PART |
Jim Sly
|
|
|
Micheal Phone #: ###-#### Store front OK.
|
BLD-Framing/Rough-in | 5/15/2018 | 5/16/2018 | 5/16/2018 | P | PART |
Jim Sly
|
|
|
micheal Phone #: ###-#### All good......Just store front area left to go.....
|
BLD-Framing/Rough-in | 4/9/2018 | 4/10/2018 | 4/10/2018 | P | PART |
Jim Sly
|
|
|
Michael Phone #: ###-#### Everything OK except......Wall separating new from existing area.
|
BLD-Footing | 3/6/2018 | 3/6/2018 | 3/6/2018 | P | PASS |
Jim Sly
|
|
|
Chris Phone #: ###-#### (2) column pad footings....OK.
|