BLD-Final | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 5/14/2018 | 5/14/2018 | 5/14/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.3
|
BLD-Final | 5/8/2018 | 5/10/2018 | 5/10/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Blower Door Test Results | 5/10/2018 | 5/10/2018 | 5/10/2018 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 3.3
|
BLD-Energy code compliance | 3/7/2018 | 3/8/2018 | 3/8/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections- SAT
|
BLD-Energy code compliance | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | NR |
Brandon Shaw
|
|
|
Shear corrections not complete
|
BLD-Energy code compliance | 3/5/2018 | 3/7/2018 | 3/7/2018 | A | NR |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Wall cover | 3/2/2018 | 3/5/2018 | 3/5/2018 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice
OK to insulate
|
BLD-Framing/Rough-in | 3/1/2018 | 3/5/2018 | 3/5/2018 | A | PEND |
Brandon Shaw
|
|
|
Pending shear corrections
|
BLD-Foundation | 12/27/2017 | 12/28/2017 | 12/28/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Foundation | 12/27/2017 | 12/27/2017 | 12/27/2017 | P | CANC |
Brandon Shaw
|
|
|
Chris Phone #: ###-####
|
BLD-Footing | 12/20/2017 | 12/20/2017 | 12/20/2017 | P | PASS |
Brandon Shaw
|
|
|
Work in prorgess
|