BLD-Blower Door Test Results | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | DONE |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall 3.9
|
BLD-Final | 6/21/2018 | 6/22/2018 | 6/22/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
DOC - Permit Finaled | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Jim Sly
|
|
|
|
BLD-Energy code compliance | 4/19/2018 | 4/20/2018 | 4/20/2018 | A | NR |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 4/16/2018 | 4/18/2018 | 4/18/2018 | A | PASS |
Brandon Shaw
|
|
|
OK to insulate
|
BLD-Wall Bracing | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Miguel- Phone #: ###-####
|
BLD-Footing | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
Frost protection required
|
BLD-Footing | 1/5/2018 | 1/5/2018 | 1/5/2018 | P | CANC |
Brandon Shaw
|
|
|
Ryan Phone #: ###-####
|