Information based on query as of Friday, April 19, 2024.
Permit Information
Permit NumberBLD17-04219
StatusIssued
Name TURN OF THE CENTURY HOMES INC
Site Address 2460 E PARKSIDE DR
Project NameParkside Dr.Residence
Customer Number 
ePlanReviewYes
Description
W.U.I. Foothills, Class"A" Roof Required. Permit for the construction of a new 3,500 sq. ft., two story (first story 3,500sq. ft., Below grade 916 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 8 sq. ft. of covered patio/porch and a 1000 sq. ft. attached garage per the approved plans and any notations. Rescheck Energy Compliance. R-1B zoning and setbacks per planning. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.



All disturbed slopes included in the construction of this project must be stabilized and approved by Public Works before a Final Occupancy Permit is granted. If weather conditions prohibit revegetation and stabilization activities, the contractor shall provide a bond/surety agreement or an irrevocable letter of credit in the amount of 110% of the cost estimated by the project engineer to enable stabilization of the site. Call 208-608-7168 for an inspection.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/29/20206/29/20206/29/2020PFAIL
DetailsBrandon Shaw
Per R312.2 Fall protection... 4 loactions
R308.4.2 safety glazing required, office door and window adjacent...
BLD-Final5/28/20205/28/20205/28/2020PNR
DetailsBrandon Shaw
Need PW approval...
BLD-Other2/4/20202/5/20202/5/2020APASS
DetailsDave Hannah
cameron- inspection for footer for landscaping Phone #: ###-####
BLD-Energy code compliance7/11/20197/12/20197/12/2019APASS
DetailsDave Hannah
Cameron Phone #: ###-####
BLD-Other7/9/20197/9/20197/9/2019PCANC
DetailsBrandon Shaw
cover with shingles on roof // Cameron Phone #: ###-####
BLD-Energy code compliance7/9/20197/9/20197/9/2019PCANC
DetailsBrandon Shaw
Cameron Phone #: ###-####
BLD-Framing/Rough-in7/9/20197/9/20197/9/2019PPASS
DetailsBrandon Shaw
OK to insulate...
BLD-Wall Bracing5/16/20195/17/20195/17/2019APASS
DetailsDave Hannah
Inspection for Shear on exterior prior to installing Tyvek Phone #: ###-#### Inspection requested via web by Cameron Brown
BLD-Foundation3/21/20193/21/20193/21/2019PPASS
DetailsBrandon Shaw
Window wells, and Main enrty stair walls...
BLD-Foundation2/24/20192/25/20192/25/2019APASS
DetailsBrandon Shaw
Work in progress...
BLD-Footing2/19/20192/20/20192/20/2019APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Cameron Brown
BLD-Foundation2/11/20192/12/20192/12/2019APART
DetailsDave Hannah
Also need to inspect ufer for electrical we have a noon poor would like a inspection early morning Phone #: ###-#### Inspection requested via web by Cameron Brown part about 50 ft back wall and north wall ok
BLD-Footing1/31/20191/31/20192/1/2019PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Cameron Brown
BLD-Footing1/23/20191/24/20191/24/2019APASS
DetailsJim Storey
Please call me at your convenience in the morning I would appreciate it thank you very much Phone #: ###-#### Inspection requested via web by Cameron Brown
BLD-Foundation1/22/20191/23/20191/23/2019ANR
DetailsMike Jordan
Cameron Phone #: ###-####. Needs public works subgrade approval first.