Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD17-04357
StatusFinaled
Name RRC CONTRACTORS
Site Address 877 W MAIN ST
Project NameGSA - 4th Floor
Customer Number 
ePlanReviewYes
Description
(GSA – WELLS FARGO BUILDING - 4th FLOOR) //Plan Modification to remove select exit signs to direct exit access egress path away from mantrap north of the elevator lobby as shown on revised exit plan sheet G1.6. (Previous alternate approval shall be met) 9-26-2015 JG // Permit is to remodel within the existing 17,100 sq. ft. 4th floor. Approval is contingent upon adhering to the approved plans on file. Approved Modifications to door hardware included with plans and documents. Work to include: removal of select walls, removal of select door/door frames, removal of select door hardware and replace with new door hardware, construction of interior non-bearing walls to create (2) conference rooms, a teaming room, an office, open office area and (2) storage rooms, select wall infill, select new interior perimeter walls and retrofitted existing walls with fire retardant treated plywood, select new door/door frames, a sink, relocating existing light fixtures, electrical work, plumbing work, mechanical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. Note: Alternate approval on file for door hardware at door 16A & 17A in storage room and 1B in hallway. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/9/201810/9/201810/9/2018PPASS
DetailsDave Hannah
Zack Phone #: ###-####***FIR permit not finaled***
BLD-Final9/27/20189/28/20189/28/2018PPASS
DetailsDave Hannah
zack Phone #: ###-####
FIRE-Final Inspection9/27/20189/28/20189/28/2018APASS
DetailsJim Page
Previously noted items have been completed, final life fire safety inspection for area of work complete.

zack Phone #: ###-####
BLD-Final9/19/20189/20/20189/21/2018PNR
DetailsDave Hannah
Zach Phone #: ###-####
FIRE-Final Inspection9/20/20189/21/20189/20/2018ACANC
DetailsJim Page
changes have not been addressed
Zack Phone #: ###-####
FIRE-Final Inspection9/20/20189/20/20189/20/2018PFAIL
DetailsAdele J Schaffeld-Griffin
1-door hardware needs to be installed to meet alternate.
2-exit sign needs added in hallway now that door installed and blocks view
3-possible revised exit plan, see architect.
4- need electrical final
Zack Phone #: ###-####
FIRE-Final Inspection9/19/20189/20/20189/20/2018ACANC
DetailsAdele J Schaffeld-Griffin
Zach Phone #: ###-####
BLD-Conference9/13/20189/13/20189/13/2018PPASS
DetailsDave Hannah
Zack Phone #: ###-####
FIRE-Conference9/13/20189/13/20189/13/2018PDONE
DetailsAdele J Schaffeld-Griffin
Confrence with Ron Johnson- This was a conference to cover requirements for TCO of main tenant space with phase two being the completion of the two storage rooms. Fire alarm permit has been pulled. FIR18-00476. All fire life safety items would need to be completed for TCO, including testing the operation of the door hardware to confirm operation per the accepted alternate. Zack Phone #: ###-####
BLD-Ceiling Grid Inspection8/31/20188/31/20188/31/2018PPASS
DetailsMike Jordan
Zack Phone #: ###-####
BLD-Ceiling Grid Inspection8/29/20188/29/20188/30/2018PPEND
DetailsDave Hannah
Zach Phone #: ###-#### ok afther elec rough ins
BLD-Framing/Rough-in7/10/20187/10/20187/10/2018PPASS
DetailsDave Hannah
Zach Phone #: ###-####