BLD-Final | 6/3/2019 | 6/5/2019 | 6/5/2019 | P | PASS |
Dave Hannah
|
|
|
This is the only building with handrails in Centennial Plaza. FInal Occ on buildings Temp Occ on Plaza Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIRE-Final Inspection | 6/3/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Jim Page
|
|
|
No fire sprinklers, no fire alarms, fire extinguisher is placed with a current inspection tag. Final life fire safety inspection for area or work complete.
Final Building Occ Centennial Plaza Temp Occ Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
FIRE-Final Inspection | 6/3/2019 | 6/4/2019 | 6/3/2019 | A | CANC |
Jim Page
|
|
|
Fire life safety final Building C1 stage. Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
FIRE-Conference | 5/24/2019 | 5/28/2019 | 5/28/2019 | A | DONE |
Jim Page
|
|
|
Fire conference complete, due to column configuration of new canopy the fire extinguisher will be mounted just above where the concrete stops on the support columns on the wood post. Extinguisher will be slighlty above the 48 inches.
Need to confirm the location for Fire extingushers will be ok where we are going to put them before we call in our final Phone #: ###-#### Inspection requested via web by Brandon Reynolds
|
BLD-Final | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | CANC |
Dave Hannah
|
|
|
Roddy Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2019 | 3/18/2019 | 3/18/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 12/4/2018 | 12/5/2018 | 12/5/2018 | A | PART |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Justin Palm ok after spec insp sign off
|