Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD17-04492
StatusFinaled
Name CBH HOMES
Site Address 7074 W COHO DR
Project Name2-3 Fork South
Customer Number 
ePlanReviewYes
Description
AIRPORT INFLUENCE AREA "A" (must meet current energy code to comply)-Permit for the construction of a new 2,539 sq. ft., two story (first story 2,275 sq. ft., second story 264 sq. ft.) single family dwelling with 4 bedrooms, 2 bathrooms, approximately 138 sq. ft. of covered patio/porch and a 705 sq. ft. attached garage per the approved plans and any notations. R-1C zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final6/1/20186/1/20186/1/2018APASS
DetailsMike Jordan
garage door code 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle
DOC - Permit Finaled6/1/20186/1/20186/1/2018PPASS
DetailsMike Jordan
BLD-Blower Door Test Results6/1/20186/1/20186/1/2018ADONE
DetailsMike Jordan
garage door code 2468 Phone #: ###-#### Inspection requested via web by Joel Hirtle.

4.5ACH @50pca
BLD-Final5/30/20185/30/20185/30/2018PFAIL
DetailsMike Jordan
Garage door code is 2468

Thanks Phone #: ###-#### Inspection requested via web by Joel Hirtle. Provide blower dorr test result and post. Everything else ok.
BLD-Final5/9/20185/10/20185/10/2018ANR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. OPen Mech. permit. Still needs final inspection.
BLD-Energy code compliance3/27/20183/27/20183/27/2018PPASS
DetailsMike Jordan
Joel Phone #: ###-####
BLD-Energy code compliance3/9/20183/9/20183/9/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in3/9/20183/9/20183/9/2018PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle
BLD-Framing/Rough-in3/7/20183/8/20183/8/2018PPEND
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Joel Hirtle ok to insulate after mec rough in
BLD-Framing/Rough-in3/6/20183/7/20183/7/2018PNR
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Needs mech. rough in inspection.
BLD-Wall Bracing2/22/20182/22/20182/22/2018APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Joel Hirtle. Exterior shear only ok.
BLD-Foundation1/23/20181/24/20181/24/2018PPASS
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Foundation1/22/20181/23/20181/23/2018PCANC
DetailsMike Jordan
Dane Phone #: ###-####
BLD-Footing1/19/20181/22/20181/22/2018PPASS
DetailsJim Sly
Dane Phone #: ###-####