BLD-Final | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Brandon Shaw
|
|
|
Andria Phone #: ###-####
|
DOC - Permit Finaled | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/15/2019 | 1/15/2019 | 1/15/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 4.5
|
BLD-Energy code compliance | 9/7/2018 | 9/7/2018 | 9/7/2018 | A | PASS |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis
|
BLD-Framing/Rough-in | 8/31/2018 | 8/31/2018 | 8/31/2018 | P | PART |
Tony Young
|
|
|
Phone #: ###-#### Inspection requested via web by Andrina Davis,, needs seal package,, ok to insulate,, will verify at energy code inspection
|
BLD-Footing | 5/22/2018 | 5/23/2018 | 5/23/2018 | A | PASS |
Brandon Shaw
|
|
|
Paul Phone #: ###-####
|
BLD-Footing | 1/16/2018 | 1/17/2018 | 1/17/2018 | A | NR |
Tony Young
|
|
|
Andrina Phone #: ###-####
|