Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-00026
StatusFinaled
Name ZACH EVANS CONSTRUCTION
Site Address 2323 N HEIGHTS DR
Project Name20-21 Rogers Heights
Customer NumberDEMO BLD17-03353
ePlanReviewYes
Description
***WUI ZONE A REQUIREMENTS*** Ref. demo permit of previous house Bld17-03353. Permit for the construction of a new 2853 sq. ft., one story single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 443 sq. ft. of covered patio/porch and a 1263 sq. ft. attached garage per the approved plans and any notations. R-1B zoning and setbacks per planning. MDH

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/12/20187/12/20187/12/2018PPASS
DetailsTony Young
Ben Phone #: ###-####
DOC - Permit Finaled7/12/20187/12/20187/12/2018PPASS
DetailsTony Young
c of o issued
BLD-Final7/3/20187/3/20187/3/2018PNR
DetailsTony Young
Ben Phone #: ###-####,, need trades,, hillside
BLD-Energy code compliance4/5/20184/6/20184/6/2018APASS
DetailsTony Young
Ben Phone #: ###-####
BLD-Other4/4/20184/5/20184/5/2018APART
DetailsTony Young
soffit-Toby-leave tag if passed Phone #: ###-####,, sheet rock soffit areas ok,, other section will be fire rated tongue and groove,, still to verify,, needs rated vents in soffits by the final
BLD-Framing/Rough-in4/2/20184/2/20184/2/2018PPASS
DetailsTony Young
Van Phone #: ###-####,, ok to insulate
BLD-Framing/Rough-in3/28/20183/28/20183/28/2018AFAIL
DetailsMike Jordan
Complete lateral bracing on A03 trusses. Complete all corrections as identified per Tony Young. Ok to insualte. Correction notice posted.
BLD-Framing/Rough-in3/27/20183/28/20183/28/2018ACANC
DetailsMike Jordan
Ben Phone #: ###-####. rescheduled. wrong entry.
BLD-Framing/Rough-in3/22/20183/22/20183/22/2018PNR
DetailsTony Young
Ben Phone #: ###-####,, needs mech pass,, dont insulate,, partial walk through
BLD-Wall Bracing3/6/20183/6/20183/6/2018PPART
DetailsTony Young
BEN Phone #: ###-####,, exterior ok to cover,, may need interior later
BLD-Wall Bracing3/5/20183/6/20183/6/2018ANR
DetailsTony Young
BEN Phone #: ###-####,, re do per plan
BLD-Foundation2/11/20182/12/20182/13/2018PPART
DetailsTony Young
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo,, work in progress,, ok
BLD-Footing2/8/20182/9/20182/9/2018PPASS
DetailsDave Hannah
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo