BLD-Final | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.79
|
BLD-Final | 9/18/2018 | 9/19/2018 | 9/19/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Energy code compliance | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Framing/Rough-in | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | FAIL |
Brandon Shaw
|
|
|
See correction notice
OK to insulate
|
BLD-Framing/Rough-in | 6/27/2018 | 6/27/2018 | 6/27/2018 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Wall Bracing | 6/22/2018 | 6/25/2018 | 6/25/2018 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT...
|
BLD-Wall Bracing | 6/18/2018 | 6/19/2018 | 6/19/2018 | A | FAIL |
Brandon Shaw
|
|
|
1) Provide hold downs as per plans 2) Hold downs not installed as per manufactures recommendation 3) uncover exterior at garage to verify nailing 4) Edge/field nailing at be as shear schedule
See Red Paint
|
BLD-Foundation | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|