Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-00254
StatusFinaled
Name SHADOW MOUNTAIN CONST INC
Site Address 4015 N SANDPOINT WAY
Project Name 
Customer Number 
ePlanReviewYes
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2538 sq. ft., one story single family dwelling with 3 bedrooms, 2 bathrooms, approximately 424 sq. ft. of covered patio/porch and a 876 sq. ft. attached garage per the approved plans, plan review report and any notations. A-1 zoning and setbacks per planning. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20194/10/20194/10/2019APASS
DetailsTony Young
Scott- please call for access Phone #: ###-####
DOC - Permit Finaled4/10/20194/10/20194/10/2019PPASS
DetailsTony Young
c of o issued
BLD-Blower Door Test Results4/10/20194/10/20194/10/2019PDONE
DetailsTony Young
Scott- please call for access Phone #: ###-####
// 4.5
BLD-Aging Inspection3/1/20193/1/20193/7/2019 PEND
DetailsTony Young
BLD-Other10/23/201810/24/201810/24/2018APASS
DetailsTony Young
sofit-Scott Phone #: ###-####
BLD-Energy code compliance10/17/201810/18/201810/18/2018PPASS
DetailsTony Young
Scott Phone #: ###-####
BLD-Framing/Rough-in10/17/201810/17/201810/17/2018PPASS
DetailsTony Young
scott johnson Phone #: ###-####
BLD-Framing/Rough-in10/16/201810/17/201810/17/2018APASS
DetailsTony Young
Scott Phone #: ###-####
BLD-Framing/Rough-in10/15/201810/16/201810/16/2018APEND
DetailsTony Young
Scott Phone #: ###-####,, needs fireplace to pass inspection,, failed rough in
BLD-Framing/Rough-in10/15/201810/15/201810/15/2018PNR
DetailsTony Young
Scott Phone #: ###-####,, needs fireplace inspection,,
BLD-Wall Bracing9/24/20189/25/20189/25/2018APASS
DetailsBrandon Shaw
Scott Phone #: ###-####
BLD-Footing8/24/20188/24/20188/24/2018PPART
DetailsTony Young
Pat Phone #: ###-####,, foundation poured,, ok
BLD-Footing8/7/20188/7/20188/7/2018PPART
DetailsTony Young
Pat Phone #: ###-####,, work in progress