BLD-Final | 9/17/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jim Sly
|
|
|
around 8 am please- Blinda Phone #: ###-####
|
DOC - Permit Finaled | 9/21/2018 | 9/21/2018 | 9/21/2018 | P | PASS |
Jim Sly
|
|
|
No one at home. No access. a visual inpection of roof from the ground was completed, and appears to be done and OK. 8:24 am
|
BLD-Final | 8/29/2018 | 8/30/2018 | 8/30/2018 | P | FAIL |
Dave Hannah
|
|
|
Blinda-please call to meet Phone #: ###-####-this permit is not for the remodel inside-it is for the Roof only (removal of existing low slope roof with truss decking & roofing) no attic venting
|
BLD-Final | 5/3/2018 | 5/4/2018 | 5/6/2018 | P | NR |
Jim Sly
|
|
|
Late PM please // Belinda Phone #: ###-#### Need Plumb Final
|
BLD-Energy code compliance | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Jim Sly
|
|
|
Belinda Phone #: ###-####
|
BLD-Energy code compliance | 3/27/2018 | 3/28/2018 | 3/28/2018 | P | CANC |
Jim Sly
|
|
|
Balinda-call for access Phone #: ###-####
|
BLD-Energy code compliance | 3/23/2018 | 3/26/2018 | 3/26/2018 | A | FAIL |
Dave Hannah
|
|
|
Belinda Phone #: ###-#### no plumbing rough in do not cover
|
BLD-Framing/Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 | A | PART |
Jim Sly
|
|
|
Belinda Phone #: ###-#### All framing and roof framing (trusses) above ceiling line.......OK.
|
BLD-Framing/Rough-in | 2/12/2018 | 2/13/2018 | 2/13/2018 | P | CANC |
Jim Sly
|
|
|
call for access- Belinda Phone #: ###-####
|