Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-00451
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 2403 S TRAPPER PL
Project NamePinnacle HN 7-1
Customer Number 
ePlanReviewYes
Description
***PLAN MOD- GRADING AND DRAINAGE MODIFIED.RELOCATED LANDSCAPE WALL.*** HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 2,983 sq. ft., two story (first story 1,483 sq. ft., second story 1,500 sq. ft.) single family dwelling with 3 bedrooms, 2 and a half bathrooms, approximately 293 sq. ft. of covered patio/porch and a 708 sq. ft. attached garage per the approved plans and any notations. SP-01 zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM***
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/6/201812/7/201812/7/2018APASS
DetailsBrandon Shaw
les Phone #: ###-####
DOC - Permit Finaled12/7/201812/7/201812/7/2018PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results12/7/201812/7/201812/7/2018ADONE
DetailsBrandon Shaw
ACH50- 4.20
ACH50- 4.20
BLD-Aging Inspection12/7/201812/7/201812/7/2018 CANC
DetailsBrandon Shaw
BLD-Aging Inspection12/6/201812/6/201812/6/2018 DEFR
DetailsBrandon Shaw
Work in progress
BLD-Energy code compliance7/25/20187/25/20187/25/2018PPASS
DetailsBrandon Shaw
Les Phone #: ###-####
BLD-Framing/Rough-in7/20/20187/20/20187/20/2018PPASS
DetailsJim Storey
Lee Phone #: ###-####
BLD-Framing/Rough-in7/18/20187/18/20187/18/2018PNR
DetailsDave Hannah
Les Phone #: ###-#### needs truss engineering on site no inspection done
BLD-Other7/16/20187/17/20187/17/2018APASS
DetailsBrandon Shaw
sofit- Les Phone #: ###-####
BLD-Wall Bracing6/20/20186/20/20186/20/2018PFAIL
DetailsBrandon Shaw
See correction notice
1) Hold downs to be as per plans
2) Drill and epoxy missing hold downs
3) Field and edge nailing to be as shear schedule
4) Up stairs bonus and Master bedroom walls to be CS-WSP as per plans
BLD-Foundation5/10/20185/11/20185/11/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing5/9/20185/9/20185/9/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing5/7/20185/7/20185/7/2018PPASS
DetailsBrandon Shaw
Work in progress