Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-00573
StatusIssued
Name SMITH ROBERT
Site Address 11423 W CAMAS ST
Project NameSmith bedroom addition
Customer Number 
ePlanReviewNo
Description
Permit to add a bedroom at the location of a previous covered porch. All work per plans, notes, & local code. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD - Request for Extension4/12/20194/15/20194/15/2019APASS
DetailsMike Jordan
Robert-needs permit extended Phone #: ###-####
BLD-Conference10/11/201810/12/201810/12/2018ACANC
DetailsMike Jordan
I would like the framing to be inspected so I may proceed with drywalling. I have also scheduled the mechanical inspection for the fireplace(install and framing) for friday am too. I hope to get both of these to pass so I may proceed the drywall in the main room. I hope to get to the plumbing for shower area this weekend. just would like to get to the mini-split install after drywall in the main room. Thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
BLD-Framing/Rough-in10/12/201810/12/201810/12/2018APASS
DetailsMike Jordan
I would like the framing to be inspected so I may proceed with drywalling. I have also scheduled the mechanical inspection for the fireplace(install and framing) for friday am too. I hope to get both of these to pass so I may proceed the drywall in the main room. I hope to get to the plumbing for shower area this weekend. just would like to get to the mini-split install after drywall in the main room. Thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
BLD-Conference9/4/20189/5/20189/5/2018PDONE
DetailsMike Jordan
Dry wall ceiling is in but walls are not. Insulation is sprayed in the walls but the ceiling has not been done yet. I was wondering, do I need to have an Insulation inspection done before moving to drywall the walls? I will have the ceiling insulation done later this week when Brandon schedules it with his crew. This will be a blow-in insulation and a top off the rest of the house, where needed.

You can just call me if I need to wait for the ceiling (which I assume) but I did not want to wait on the wall drywall unless I had to. just unsure on where my next inspection is. I have the mechanical inspector coming tomorrow for the wood stove and mini split conference, before I get to far on those.

Thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
BLD-Framing/Rough-in9/5/20189/5/20189/5/2018PPASS
DetailsMike Jordan
Dry wall ceiling is in but walls are not. Insulation is sprayed in the walls but the ceiling has not been done yet. I was wondering, do I need to have an Insulation inspection done before moving to drywall the walls? I will have the ceiling insulation done later this week when Brandon schedules it with his crew. This will be a blow-in insulation and a top off the rest of the house, where needed.

You can just call me if I need to wait for the ceiling (which I assume) but I did not want to wait on the wall drywall unless I had to. just unsure on where my next inspection is. I have the mechanical inspector coming tomorrow for the wood stove and mini split conference, before I get to far on those.

Thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
BLD-Conference4/16/20184/16/20184/16/2018APASS
DetailsMike Jordan
1st framing inspection before I can put house wrap, windows and door on.
thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
BLD-Wall Bracing4/16/20184/16/20184/16/2018APASS
DetailsMike Jordan
1st framing inspection before I can put house wrap, windows and door on.
thanks, Robert Phone #: ###-#### Inspection requested via web by Robert Smith
BLD-Energy code compliance3/9/20183/12/20183/12/2018APASS
DetailsMike Jordan
Dustin Phone #: ###-####. Rigid insulation on stermwall ok.
BLD-Foundation3/8/20183/9/20183/9/2018APASS
DetailsMike Jordan
BLD-Footing3/7/20183/8/20183/8/2018PPART
DetailsMike Jordan
Dustin Phone #: ###-####. Work in progress. Will be monoplacement. Will inspect formwork tomorrow in the am prior to concrete.