Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-00682
StatusFinaled
Name TBL CONSTRUCTION
Site Address 2990 E STONE POINT DR
Project NameMalberg remodel
Customer Number 
ePlanReviewNo
Description
**MODIFICATION, RECESSING A SECTION OF FLOOR FOR ZERO-THRESHHOLD SHOWER AND ADDING AN EXTERIOR DOOR **jab** - ENGINEERED SHEAR UPDATED 6-27-18 **jab** WUI - HILLSIDE - MODIFICATION - Permit for a remodel, to include: adding 278sq' to the garage, adding 1,220sq' to the home, & full gut-to-the-studs reconfigure and reroof of the home. Final home is 4Bd/3.5Bth. All work per plans, specs, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB** 6/22/18- Permit for interior demo for discovery. Removing cabinets, fixtures, gyp board, interior walls, etc. Home is in the Hillside. **JAB**
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection4/25/20194/25/20194/25/2019 PASS
DetailsBrandon Shaw
DOC - Permit Finaled4/25/20194/25/20194/25/2019PPASS
DetailsBrandon Shaw
BLD-Conference1/25/20191/25/20191/25/2019PDONE
DetailsBrandon Shaw
Per final walk thru...
BLD-Framing/Rough-in12/12/201812/12/201812/12/2018APASS
DetailsBrandon Shaw
Call tim if any issues.

Please check new south door framing and approve to insulate. Thanks
Tim
Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Footing11/28/201811/28/201811/28/2018PPART
DetailsBrandon Shaw
Zero threshold/ADA shower,
BLD-Framing/Rough-in10/17/201810/17/201810/23/2018PPASS
DetailsBrandon Shaw
Mechanical has passed. And air seal is done

Thank u.

Tim Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Energy code compliance10/20/201810/22/201810/22/2018APASS
DetailsJim Sly
Call tim if any problems. Thank you Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD-Framing/Rough-in10/16/201810/16/201810/16/2018PNR
DetailsBrandon Shaw
Need Mech rough-in...
No air/foam seal...
BLD-Wall Bracing8/29/20188/29/20188/29/2018APASS
DetailsBrandon Shaw
OK to cover exterior
BLD-Foundation6/29/20186/29/20186/29/2018PPASS
DetailsBrandon Shaw
As late as possible Phone #: 2086971241 >> Inspection requested via mobile web by Heron lira
BLD-Footing6/25/20186/26/20186/26/2018APASS
DetailsBrandon Shaw
Work in progress