BLD-Final | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Dave Hannah
|
|
|
Hi, We might be out walking around the neighborhood, please call or text 15 min prior to arrival and we''ll be here. Thanks Austin ###-#### Phone #: ###-#### Inspection requested via web by Lauren Perreault
|
DOC - Permit Finaled | 6/7/2019 | 6/7/2019 | 6/7/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Energy code compliance | 10/11/2018 | 10/11/2018 | 10/11/2018 | P | PASS |
Dave Hannah
|
|
|
Requesting insulation inspection. Back door is open. Thanks, Austin and Lauren Phone #: ###-#### Inspection requested via web by Lauren Perreault
|
BLD-Framing/Rough-in | 10/4/2018 | 10/4/2018 | 10/4/2018 | P | PASS |
Brandon Shaw
|
|
|
Lauren and I would like to meet you at the house for the inspection. If possible, please give us a call 30 min prior to the inspection. The back door is unlocked. Thanks, Austin and Lauren Phone #: ###-#### Inspection requested via web by Lauren Perreault
|
BLD-Framing/Rough-in | 5/8/2018 | 5/9/2018 | 5/9/2018 | P | NR |
Dave Hannah
|
|
|
We think we are ready for our wall bracing inspection for our addition. Please give me a ring at least 20 min prior to your arrival so Lauren and I can meet you there. Thanks, Austin ###-#### Phone #: ###-#### Inspection requested via web by Lauren Perreault
|
BLD-Wall Bracing | 5/9/2018 | 5/9/2018 | 5/9/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Foundation | 3/27/2018 | 3/27/2018 | 3/27/2018 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Footing | 3/26/2018 | 3/27/2018 | 3/27/2018 | A | PASS |
Dave Hannah
|
|
|
We are ready for our rebar and form inspection. We would like to meet you at the property so please call thirty minutes prior so we can leave work. Thanks. Austin and Lauren ###-#### Phone #: ###-#### Inspection requested via web by Lauren Perreault
|