BLD-Energy code compliance | 5/2/2019 | 5/3/2019 | 5/3/2019 | P | PASS |
Brandon Shaw
|
|
|
Scott Phone #: ###-####
|
BLD-Framing/Rough-in | 4/30/2019 | 4/30/2019 | 4/30/2019 | P | PASS |
Tony Young
|
|
|
Scott Phone #: ###-####,, ok to insulate
|
BLD-Aging Inspection | 4/19/2019 | 4/19/2019 | 4/22/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Aging Inspection | 4/18/2019 | 4/18/2019 | 4/22/2019 | | PEND |
Tony Young
|
|
|
|
BLD-Framing/Rough-in | 12/4/2018 | 12/5/2018 | 12/5/2018 | P | PART |
Brandon Shaw
|
|
|
Exterior sheating...
OK to cover/wrap and install windows
|
BLD-Framing/Rough-in | 11/13/2018 | 11/14/2018 | 11/14/2018 | A | PART |
Tony Young
|
|
|
Scott-hold downs Phone #: ###-####,, hold down locations,, ok
|
BLD-Framing/Rough-in | 10/5/2018 | 10/5/2018 | 10/5/2018 | P | PART |
Tony Young
|
|
|
Scott Phone #: ###-####,, ?s on frame,, verified fire treated deck beams, walk through,, talked about wui
|
BLD-Foundation | 8/27/2018 | 8/28/2018 | 8/28/2018 | A | DONE |
Tony Young
|
|
|
Pat
|
BLD-Footing | 8/22/2018 | 8/23/2018 | 8/23/2018 | A | PASS |
Tony Young
|
|
|
Pat Phone #: ###-####
|
BLD-Footing | 8/21/2018 | 8/22/2018 | 8/22/2018 | A | PEND |
Tony Young
|
|
|
Pat Phone #: ###-####,, needs soils approval
|
BLD-Footing | 8/21/2018 | 8/21/2018 | 8/21/2018 | P | NR |
Tony Young
|
|
|
Pat-pour time1:00 Phone #: ###-####,, needs soils approval
|
BLD-Footing | 8/13/2018 | 8/14/2018 | 8/14/2018 | A | NR |
Brandon Shaw
|
|
|
Need PW approval
|