Information based on query as of Sunday, May 19, 2024.
Permit Information
Permit NumberBLD18-00980
StatusFinaled
Name DEBELLOY CONSTRUCTION
Site Address 10033 W ESHELMAN ST
Project NameEshelman Duplex
Customer Number 
ePlanReviewYes
Description
*** Plan Modification - 2/7/19 - Using a Split Mini System for heating/cooling and modified the upper floor roof trusses. - *** (10033 & 10021 W. Eshelman St.) Permit for the construction of a new 3,714 sq. ft. duplex. Unit A is 1,412 sq. ft. with 3 bedrooms, 2 and a half bathrooms, approximately 90 sq. ft. of covered patio/porch and 454 sq. ft. attached garage. Unit B is 1,412 sq. ft. with 3 bedrooms, 2 and a half bathrooms, approximately 15 sq. ft. of covered patio/porch and 454 sq. ft. attached garage. All work per the approved plans and any notations. R-1C zoning and setbacks per planning. Prescriptive Energy Code is proposed. ***BJM***
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results7/23/20197/23/20197/23/2019PDONE
DetailsTell Riley
10033 Eshelman--4.6 ACH50//1000cfm @ 50 Pa

10021 Eshelman--4.6 ACH50//1000cfm @ 50 Pa
BLD-Final7/22/20197/23/20197/23/2019APASS
DetailsTell Riley
call me for entry code , blower door test has passed on both units Phone #: ###-#### Inspection requested via web by kevin debelloy
DOC - Permit Finaled7/23/20197/23/20197/23/2019PPASS
DetailsTell Riley
BLD-Final7/18/20197/19/20197/19/2019ANR
DetailsTell Riley
please call before arrival so I can meet you there to gain access.

Thanks ~Kevin ###-#### Phone #: ###-#### Inspection requested via web by kevin debelloy//need blower door tests//
BLD-Energy code compliance5/14/20195/14/20195/14/2019APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Framing/Rough-in5/14/20195/14/20195/14/2019APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Framing/Rough-in5/9/20195/9/20195/9/2019AFAIL
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
C/N posted.
BLD-Wall Bracing5/8/20195/8/20195/8/2019APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Foundation3/18/20193/18/20193/19/2019PDONE
DetailsTony Young
Pour is set for 1:30 should be ready for inspection anytime today Phone #: ###-#### Inspection requested via web by kevin debelloy
BLD-Footing3/14/20193/14/20193/14/2019PPASS
DetailsJim Sly
Footings pour is scheduled for 1:30 and is ready anytime for inspection before that Phone #: ###-#### Inspection requested via web by kevin debelloy