BLD-Final | 8/8/2018 | 8/9/2018 | 8/9/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by daniel solsman
|
DOC - Permit Finaled | 8/9/2018 | 8/9/2018 | 8/9/2018 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Blower Door Test Results | 8/9/2018 | 8/9/2018 | 8/9/2018 | A | DONE |
Mike Jordan
|
|
|
4.4ACH @50pa
|
BLD-Energy code compliance | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 6/22/2018 | 6/22/2018 | 6/22/2018 | P | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Framing/Rough-in | 6/20/2018 | 6/20/2018 | 6/20/2018 | P | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates. Nail 2 ply A03 girder truss per the truss engineering. Install the 4x10 header over door to understairway. Justify the oversized holes in the LVL at 2nd floor framing by stairs. Ok to insulate. Correction noice posted.
|
BLD-Wall Bracing | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Philip Yates
|
BLD-Foundation | 5/11/2018 | 5/14/2018 | 5/14/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 5/10/2018 | 5/11/2018 | 5/11/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo
|