Permit Information
Permit NumberBLD18-01295
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: 230
Project NameSt. Lukes WGCP - Suite 230
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGCP – 2nd FLOOR SUITE #230) The fire sprinkler system is used for unlimited area of the building. Permit is to remodel an existing 2,233 sq. ft. business space on the 2nd floor within the existing building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of suspended acoustic ceiling, removal of select millwork, construction of select interior nonbearing walls to create (2) interview rooms, a communication room, a copy/work area, a break area, open office area, a conference room and a reception/waiting area, select new door/door frames, new suspended acoustic ceiling, light fixtures, electrical work, plumbing work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20188/3/20188/3/2018APASS
DetailsDave Hannah
Zach Phone #: ###-####
FIRE-Final Inspection7/31/20188/1/20188/1/2018APASS
DetailsJim Page
Fianl life fire safety inspection for area of work complete.

Zack Phone #: ###-####
BLD-Ceiling Grid Inspection7/24/20187/25/20187/25/2018APASS
DetailsDave Hannah
Zac Phone #: ###-####
BLD-Framing/Rough-in5/22/20185/22/20185/23/2018PPASS
DetailsDave Hannah
Zach Phone #: ###-####