BLD-Final | 10/11/2019 | 10/11/2019 | 10/11/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce
|
DOC - Permit Finaled | 10/11/2019 | 10/11/2019 | 10/11/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 10/11/2019 | 10/11/2019 | 10/11/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 4.2
|
BLD-Energy code compliance | 8/7/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by Josh Benart
|
BLD-Framing/Rough-in | 8/6/2019 | 8/6/2019 | 8/6/2019 | A | PASS |
Brandon Shaw
|
|
|
Corrections SAT... OK to insulate...
|
BLD-Framing/Rough-in | 8/3/2019 | 8/5/2019 | 8/5/2019 | A | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by Laz Ponce//need truss plans onsite//need to fire block at stairs and flatforms, also at furred ceilings//correction notice onsite//
|
BLD-Wall Bracing | 7/31/2019 | 8/1/2019 | 8/1/2019 | A | PASS |
Brandon Shaw
|
|
|
Call ahead // Guillermo Phone #: ###-####
|
BLD-Conference | 6/10/2019 | 6/10/2019 | 6/10/2019 | P | DONE |
Brandon Shaw
|
|
|
Firewall
|
BLD-Conference | 2/15/2019 | 2/15/2019 | 2/15/2019 | P | DEFR |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Aging Inspection | 2/15/2019 | 2/15/2019 | 2/15/2019 | | CANC |
Brandon Shaw
|
|
|
|
BLD-Aging Inspection | 2/14/2019 | 2/14/2019 | 2/14/2019 | | CANC |
Brandon Shaw
|
|
|
Work in progress...
|
BLD-Footing | 10/3/2018 | 10/3/2018 | 10/3/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|