BLD-Final | 3/4/2020 | 3/5/2020 | 3/5/2020 | A | PASS |
Jim Storey
|
|
|
Nitrogen Plant Phone #: ###-#### Inspection requested via web by Wayne Berry
|
DOC - Permit Finaled | 3/5/2020 | 3/5/2020 | 3/5/2020 | P | PASS |
Jim Storey
|
|
|
|
FIRE-Final Inspection | 3/3/2020 | 3/3/2020 | 3/3/2020 | P | PASS |
Jim Page
|
|
|
Official letter from a PE has been provided, final life fire safety inspection for scope of work complete.
###-#### is my contact number cell... Per Romeo this should be good to go since we have a stamped certification letter from the project PE. Inspection requested via web by Wayne Berry
|
FIRE-Final Inspection | 2/4/2020 | 2/5/2020 | 2/5/2020 | A | FAIL |
Jim Page
|
|
|
Spoke with Ron Johnson with Boise Fire, items noted by Adele on 22MAY2018 have not been completed according to him. Items must be completed before life fire safety can be signed off.
Phone #: ###-#### Inspection requested via web by Wayne Berry
|
FIRE-Final Inspection | 2/3/2020 | 2/4/2020 | 2/4/2020 | A | FAIL |
Jim Page
|
|
|
Called point of contact listed at 0945, left message with my contact information and stated that if a return call was not made by 1000 then I was going to proceed to next inspection. Inspection request was left open until 12:30PM with no return call, inspection request will need to be rescheduled.
Life Safety Final Phone #: ###-#### Inspection requested via web by Wayne Berry
|
BLD-Foundation | 9/21/2018 | 9/24/2018 | 9/24/2018 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### placed w si
|
BLD-Foundation | 8/28/2018 | 8/29/2018 | 8/29/2018 | A | PASS |
Jim Storey
|
|
|
REBAR- BRIAN Phone #: ###-####
|
BLD-Foundation | 8/10/2018 | 8/13/2018 | 8/13/2018 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### placed w/si
|
BLD-Foundation | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PART |
Jim Storey
|
|
|
Brian Phone #: ###-#### placed w/si
|
BLD-Other | 7/25/2018 | 7/30/2018 | 7/30/2018 | P | PART |
Jim Storey
|
|
|
slab rebar - Brian Phone #: ###-#### place w/si
|
BLD-Other | 7/25/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Storey
|
|
|
slab rebar - Brian Phone #: ###-####
|
BLD-Foundation | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### top out
|
BLD-Foundation | 7/6/2018 | 7/9/2018 | 7/9/2018 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Concrete | 6/21/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Storey
|
|
|
column/rebar - brian Phone #: ###-####
|
BLD-Footing | 6/20/2018 | 6/21/2018 | 6/21/2018 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
BLD-Footing | 6/13/2018 | 6/13/2018 | 6/13/2018 | P | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####pending report ok
|