BLD-Final | 2/1/2019 | 2/4/2019 | 2/4/2019 | A | PASS |
Tony Young
|
|
|
Goldie Phone #: ###-####
|
DOC - Permit Finaled | 2/4/2019 | 2/4/2019 | 2/4/2019 | P | PASS |
Tony Young
|
|
|
|
BLD-Wall cover | 10/29/2018 | 10/29/2018 | 10/29/2018 | P | PASS |
Tony Young
|
|
|
Goldy Phone #: ###-####,, insulation ok
|
BLD-Framing/Rough-in | 10/23/2018 | 10/24/2018 | 10/24/2018 | A | PASS |
Tony Young
|
|
|
Goldy Phone #: ###-####
|
BLD-Conference | 9/27/2018 | 9/27/2018 | 9/27/2018 | P | DONE |
Mike Jordan
|
|
|
Goldy Phone #: ###-####
|
BLD-Wall Bracing | 8/17/2018 | 8/17/2018 | 8/17/2018 | P | PASS |
Tony Young
|
|
|
Goldie-nailing-would like as early as possible if possible Phone #: ###-####
|
BLD-Foundation | 6/11/2018 | 6/12/2018 | 6/12/2018 | A | PART |
Tony Young
|
|
|
Tim Phone #: ###-####,, work in progress,, ok
|
BLD-Foundation | 6/8/2018 | 6/11/2018 | 6/11/2018 | A | DONE |
Dave Hannah
|
|
|
Tim Phone #: ###-####-trench full of water
|
BLD-Footing | 6/6/2018 | 6/7/2018 | 6/7/2018 | A | PART |
Mike Jordan
|
|
|
plans on patio // Tim Phone #: ###-####. Needs to provide additional vertical reinforcement. Should have two verts at required spacing, not one. Contacted Tim to notify him. Ok to place concrete. Will verify additional verts on stemwall inspection.
|