BLD-Final | 1/18/2019 | 1/22/2019 | 1/22/2019 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### Inspection requested via web by Kyle Seick
|
DOC - Permit Finaled | 1/22/2019 | 1/22/2019 | 1/22/2019 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 1/11/2019 | 1/15/2019 | 1/15/2019 | A | CANC |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.83
|
BLD-Final | 1/9/2019 | 1/9/2019 | 1/9/2019 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Final | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kyle Seick Inspection cancelled from web by: Kyle Seick
|
BLD-Energy code compliance | 10/2/2018 | 10/3/2018 | 10/3/2018 | A | PASS |
Brandon Shaw
|
|
|
rolo Phone #: ###-####
|
BLD-Framing/Rough-in | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PEND |
Brandon Shaw
|
|
|
Pending fire sprinkler approval
|
BLD-Other | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Brandon Shaw
|
|
|
Sofit // Rolo Phone #: ###-####
|
BLD-Wall Bracing | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Foundation | 7/6/2018 | 7/6/2018 | 7/6/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Brandon Shaw
|
|
|
As early as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell
|
BLD-Footing | 7/3/2018 | 7/3/2018 | 7/3/2018 | P | CANC |
Brandon Shaw
|
|
|
A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
|