BLD-Blower Door Test Results | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Tony Young
|
|
|
John Phone #: ###-####// 3.2 per contractor,, not posted yet
|
DOC - Permit Finaled | 12/3/2018 | 12/3/2018 | 12/3/2018 | P | PASS |
Tony Young
|
|
|
|
BLD-Final | 11/30/2018 | 12/3/2018 | 12/3/2018 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Final | 11/29/2018 | 11/30/2018 | 11/30/2018 | A | NR |
Tony Young
|
|
|
John Phone #: ###-####--please call to get access code// needs bloweer door test results,, fire caulk a/c line by the furnace,, tempered glass in the window next to the patio door
|
BLD-Energy code compliance | 9/10/2018 | 9/11/2018 | 9/11/2018 | A | PASS |
Brandon Shaw
|
|
|
John Phone #: ###-####
|
BLD-Framing/Rough-in | 9/7/2018 | 9/10/2018 | 9/10/2018 | A | PASS |
Jim Sly
|
|
|
John Phone #: ###-#### FRAME AND ENERGY>>>>>OK.
|
BLD-Framing/Rough-in | 9/7/2018 | 9/7/2018 | 9/7/2018 | P | PASS |
Tony Young
|
|
|
Phone #: 208-6=###-####
|
BLD-Framing/Rough-in | 9/5/2018 | 9/5/2018 | 9/5/2018 | P | PART |
Tony Young
|
|
|
Bret Phone #: ###-####,, ok to insulate,, needs
|
BLD-Wall Bracing | 7/27/2018 | 7/27/2018 | 7/30/2018 | P | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Wall Bracing | 7/26/2018 | 7/27/2018 | 7/27/2018 | A | PASS |
Tony Young
|
|
|
John Phone #: ###-####
|
BLD-Footing | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Tony Young
|
|
|
Jose Phone #: ###-####,, ok after adding rebar and adding another side footing on the back of the garage on the edge
|
BLD-Footing | 7/2/2018 | 7/3/2018 | 7/3/2018 | A | NR |
Tony Young
|
|
|
Jose--around 11 is best Phone #: ###-####
|
BLD-Footing | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | NR |
Tony Young
|
|
|
Jose--around 11 is best Phone #: ###-####,, re-digging hole
|
BLD-Footing | 6/29/2018 | 7/2/2018 | 7/2/2018 | A | NR |
Tony Young
|
|
|
Jose--around 11 is best Phone #: ###-####
|