BLD-Final | 12/20/2018 | 12/21/2018 | 12/21/2018 | A | PASS |
Jim Storey
|
|
|
Call at least 20 minutes prior: Larren Phone #: ###-####
|
DOC - Permit Finaled | 12/21/2018 | 12/21/2018 | 12/21/2018 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 12/19/2018 | 12/20/2018 | 12/20/2018 | A | NH |
Jim Storey
|
|
|
Larren Phone #: ###-####
|
BLD-Framing/Rough-in | 10/11/2018 | 10/12/2018 | 10/12/2018 | A | PASS |
Jim Storey
|
|
|
Larren Phone #: ###-#### c/n made ok/ insulation pass//
|
BLD-Framing/Rough-in | 10/9/2018 | 10/10/2018 | 10/10/2018 | P | PART |
Jim Storey
|
|
|
Larren Phone #: ###-#### support raffter at entry/ hanger rafter to back girder ar door and mech non bearing. ok to insulate.
|
BLD-Wall Bracing | 7/23/2018 | 7/24/2018 | 7/24/2018 | P | PASS |
Jim Storey
|
|
|
Larren Phone #: ###-#### walls ok and floor condition space vizqueen and insulation ok to cover.
|
BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 | P | PASS |
Mike Jordan
|
|
|
call 15 mins ahead- Larren Phone #: ###-####. Vapor barrier under floor framing and blocking for load path on 3 ply grder .
|
BLD-Conference | 7/18/2018 | 7/18/2018 | 7/18/2018 | P | DONE |
Mike Jordan
|
|
|
call 15 mins ahead- Larren Phone #: ###-####
|
BLD-Foundation | 5/29/2018 | 5/30/2018 | 5/30/2018 | A | PASS |
Jim Storey
|
|
|
Wes Phone #: ###-####
|
BLD-Footing | 5/24/2018 | 5/25/2018 | 5/25/2018 | A | PASS |
Jim Sly
|
|
|
Wes Phone #: ###-####
|