Permit NumberBLD18-01729
StatusFinaled
Name CANYON CREST HOMES
Site Address 4023 N EYRIE WAY
Project Name11-4 Eyrie Canyon
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3,272 sq. ft., two story (first story 2,137 sq. ft., below grade 1,135 sq. ft.) single family dwelling with 4 bedrooms, 4 and a half bathrooms, approximately 669 sq. ft. of covered patio/porch and a 917 sq. ft. attached garage per the approved plans and any notations. A-1 zoning and setbacks per planning.

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/18/20197/18/20197/18/2019PPASS
DetailsBrandon Shaw
garage keycode 3283 Phone #: ###-#### Inspection requested via web by David Wipper
DOC - Permit Finaled7/18/20197/18/20197/18/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results7/18/20197/18/20197/18/2019PDONE
DetailsBrandon Shaw
ACH50- 4.1
BLD-Other1/3/20191/4/20191/4/2019APASS
DetailsTony Young
soffit // Larry Phone #: ###-####,, work in progress
BLD-Energy code compliance12/20/201812/21/201812/21/2018PPASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Framing/Rough-in12/18/201812/19/201812/19/2018APASS
DetailsJim Sly
Larry Phone #: ###-####
BLD-Wall Bracing11/29/201812/3/201812/3/2018APASS
DetailsTony Young
Larry Phone #: ###-####
BLD-Foundation10/9/201810/10/201810/10/2018APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, ok
BLD-Foundation10/9/201810/9/201810/9/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, work has been in progress,, ok,, no one around due to rain
BLD-Footing10/3/201810/4/201810/4/2018APART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Ben Sears,, work in progress,, ok
BLD-Foundation9/5/20189/6/20189/6/2018APART
DetailsJim Sly
Request early Inspection hope to pour at 10. Phone #: ###-#### Inspection requested via web by Ben Sears
Main House walls OK
BLD-Footing9/4/20189/4/20189/4/2018APART
DetailsTony Young