BLD-Blower Door Test Results | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | DONE |
Tell Riley
|
|
|
duplex
4.49 ACH 50 1001 cfm @ 50 pa
4.34 ACH 50 934 cfm @ 50 pa
|
BLD-Final | 9/6/2019 | 9/9/2019 | 9/9/2019 | A | PASS |
Tell Riley
|
|
|
Barb Phone #: ###-####//corrections made//
|
DOC - Permit Finaled | 9/9/2019 | 9/9/2019 | 9/9/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 9/4/2019 | 9/5/2019 | 9/5/2019 | A | FAIL |
Tell Riley
|
|
|
Barb Phone #: ###-####//need blower door test//seal penetrations in garage/house separation wall//add smoke detector to room in 9010//
|
BLD-Aging Inspection | 8/28/2019 | 8/28/2019 | 8/28/2019 | | PASS |
Tell Riley
|
|
|
Expires: 10/13/19
|
BLD-Energy code compliance | 4/16/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-####
|
BLD-Framing/Rough-in | 4/5/2019 | 4/8/2019 | 4/8/2019 | A | PASS |
Jim Sly
|
|
|
Barb Phone #: ###-####
|
BLD-Wall Bracing | 9/25/2018 | 9/26/2018 | 9/26/2018 | A | PASS |
Jim Sly
|
|
|
Barb Phone #: ###-#### 1st story walls between units have been built to townhouse standards.
|
BLD-Other | 9/20/2018 | 9/21/2018 | 9/21/2018 | A | PASS |
Jim Sly
|
|
|
Aaron-party wall inspect Phone #: ###-####
|
BLD-Foundation | 7/5/2018 | 7/5/2018 | 7/5/2018 | P | PASS |
Jim Sly
|
|
|
Eric Phone #: ###-####
|
BLD-Footing | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Jim Sly
|
|
|
Eric-duplex Phone #: ###-####
|