BLD-Final | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Brandon Shaw
|
|
|
Correction SAT...
|
DOC - Permit Finaled | 4/26/2019 | 4/26/2019 | 4/26/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Final | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | FAIL |
Brandon Shaw
|
|
|
Continuity of handrail- no less than 1 1/2" between wall and handrail... Stair riser- greatest height within any flight of strairs not to exceed 3/8"... Window fall protection, no more than a 4" opening for windows more than 72" above grade, and less than 24" above floor...
|
BLD-Blower Door Test Results | 4/23/2019 | 4/23/2019 | 4/23/2019 | A | DONE |
Brandon Shaw
|
|
|
ACH50- 1.6
|
BLD-Energy code compliance | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|
BLD-Framing/Rough-in | 9/28/2018 | 9/28/2018 | 9/28/2018 | P | PASS |
Brandon Shaw
|
|
|
Correction SAT...
|
BLD-Framing/Rough-in | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | PEND |
Brandon Shaw
|
|
|
Pending corrections, see wall brace entry...
OK to insulate
|
BLD-Wall Bracing | 9/25/2018 | 9/25/2018 | 9/25/2018 | P | FAIL |
Brandon Shaw
|
|
|
Fire block Mech. and fire place chase's... Hold downs to be nailed as per Man. recommendations... Interior shear walls to be as per plans... Blocking for PHF in be positively secured to beam...
|
BLD-Foundation | 8/1/2018 | 8/2/2018 | 8/2/2018 | A | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/29/2018 | 7/30/2018 | 7/30/2018 | P | PASS |
Brandon Shaw
|
|
|
Work in progress
|
BLD-Footing | 7/26/2018 | 7/27/2018 | 7/27/2018 | P | CANC |
Brandon Shaw
|
|
|
Phone #: ###-#### Inspection requested via web by bryan murdoch
|