Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-01935
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 3359 E ECHO CT
Project Name 
Customer Number 
ePlanReviewNo
Description
HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3128 sq. ft., two story (first story 1927 sq. ft., second story 1201 sq. ft.) single family dwelling with 4 bedrooms, 3.5 bathrooms, approximately 230 sq. ft. of covered patio/porch and a 952 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A/DA zoning and setbacks per planning. REScheck provided for Energy Compliance. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.


Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/26/20194/26/20194/26/2019PPASS
DetailsBrandon Shaw
Correction SAT...
DOC - Permit Finaled4/26/20194/26/20194/26/2019PPASS
DetailsBrandon Shaw
BLD-Final4/23/20194/23/20194/23/2019AFAIL
DetailsBrandon Shaw
Continuity of handrail- no less than 1 1/2" between wall and handrail...
Stair riser- greatest height within any flight of strairs not to exceed 3/8"...
Window fall protection, no more than a 4" opening for windows more than 72" above grade, and less than 24" above floor...
BLD-Blower Door Test Results4/23/20194/23/20194/23/2019ADONE
DetailsBrandon Shaw
ACH50- 1.6
BLD-Energy code compliance9/28/20189/28/20189/28/2018PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in9/28/20189/28/20189/28/2018PPASS
DetailsBrandon Shaw
Correction SAT...
BLD-Framing/Rough-in9/25/20189/25/20189/25/2018PPEND
DetailsBrandon Shaw
Pending corrections, see wall brace entry...

OK to insulate
BLD-Wall Bracing9/25/20189/25/20189/25/2018PFAIL
DetailsBrandon Shaw
Fire block Mech. and fire place chase's...
Hold downs to be nailed as per Man. recommendations...
Interior shear walls to be as per plans...
Blocking for PHF in be positively secured to beam...
BLD-Foundation8/1/20188/2/20188/2/2018APASS
DetailsBrandon Shaw
Work in progress
BLD-Footing7/29/20187/30/20187/30/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing7/26/20187/27/20187/27/2018PCANC
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by bryan murdoch