Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-02047
StatusFinaled
Name ST LUKES HEALTH SYSTEM LTD
Site Address 720 E PARK BLVD Unit: B102
Project NameSt Lukes WGCP - Suite #B102
Customer Number 
ePlanReviewYes
Description
(ST. LUKES WGCP - BASEMENT SUITE #B102) Permit is to remodel an existing 727 sq. ft. business space. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, removal of select suspended ceiling, construction of interior non-bearing walls to create a demising walls, select new door/doorframe, millwork, select new suspended acoustic ceiling, light fixtures, electrical work, mechanical work and interior finishes in compliance with Ch. 8 of the current IBC. This building is fully Fire Sprinklered. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/25/20189/25/20189/25/2018PPASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rocky donica
FIRE-Final Inspection9/24/20189/24/20189/24/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete, final fire alarm inspection complete, fire extinguishers are placed with current inspection tags. Final life fire safety inspection for area of work complete.
BLD-Ceiling Grid Inspection8/21/20188/21/20188/21/2018APASS
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by rocky donica
BLD-Framing/Rough-in7/24/20187/24/20187/24/2018PPASS
DetailsDave Hannah
Zac Phone #: ###-####