BLD-Final | 1/30/2020 | 1/31/2020 | 1/31/2020 | P | PASS |
Mike Jordan
|
|
|
nACHO Phone #: ###-####. All issues resolved. Ok for perm occ.
|
FIRE-Final Inspection | 1/30/2020 | 1/31/2020 | 1/31/2020 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. Panic hardware to be installed on door 106A prior to the building inspection. Anthony at boise fire station #6 verified that the optican for both gates was functional.
nACHO Phone #: ###-####
|
BLD-Final | 12/26/2019 | 12/27/2019 | 12/27/2019 | A | PART |
Dave Hannah
|
|
|
Nacho Phone #: ###-#### ok for tco needs other trades to go perm also needs to finish signage and mill work
|
FIRE-Final Inspection | 12/26/2019 | 12/27/2019 | 12/27/2019 | A | PART |
Jim Page
|
|
|
Previously noted items have been corrected with exception to the door that was notated by Troy, opticon sensors not in place for access gates but gates are left open for fire truck access until opticon is operational. Fire alarm inspection has been completed, fire sprinkler inspections have been completed, fire extinguishers are placed with current inspection tags. A partial final inspection for life fire safety is complete, per conversation with Ron Johnson, a 90 TCO is authorized for life fire safety.
Nacho Phone #: ###-####
|
FIRE-Final Inspection | 12/17/2019 | 12/17/2019 | 12/17/2019 | P | FAIL |
Troy Cobbley
|
|
|
The associated Grading permit needs scheduled/inspected/passed, need the emergency lights added and other repaired as per plans, need exit sign added as per plans, need panic hardware provided as per plans, need permanant address, need electric gates/opticon installed and tested.
Nacho Phone #: ###-####
|
FIRE-Final Inspection | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | FAIL |
Troy Cobbley
|
|
|
Not ready for a final yet. This inspection was for the Boise Fire dept determination of an Operational Permit for a Christmas Party. The Sales area, south portion, of the new building has its life safety inspection approved. I contacted Chief Ron with the Boise Fire Dept. and let him know. Nacho Phone #: ###-####
|
BLD-Final | 12/5/2019 | 12/6/2019 | 12/6/2019 | A | DONE |
Mike Jordan
|
|
|
Nacho Phone #: ###-####
|
BLD-Conference | 12/3/2019 | 12/4/2019 | 12/4/2019 | A | DONE |
Mike Jordan
|
|
|
Nacho ###-####
|
FIRE-Final Inspection | 12/3/2019 | 12/3/2019 | 12/3/2019 | P | FAIL |
Troy Cobbley
|
|
|
Inspection was actually for a conference to provide guide lines for the use of the south end/sales are for a Christmas function. It appears the gate for the existing fire hydrant needs installed, building address, Riser and Electrical Room signage, grading permit sign off, fire extinguishers mounted and a fire dept approved temp barrier to the rest of the building. Also needed is a building inspection and approval for the use of the building/area.
Nacho Phone #: ###-####
|
BLD-Ceiling Grid Inspection | 11/12/2019 | 11/12/2019 | 11/12/2019 | P | PASS |
Mike Jordan
|
|
|
Nacho Phone #: ###-####
|
BLD-Final | 10/29/2019 | 10/30/2019 | 10/30/2019 | A | CANC |
Mike Jordan
|
|
|
Nacho Phone #: ###-####
|
BLD-Framing/Rough-in | 10/30/2019 | 10/30/2019 | 10/30/2019 | A | PASS |
Mike Jordan
|
|
|
Nacho Phone #: ###-####. Steel stud framing for fireplace ok.
|
BLD-Framing/Rough-in | 8/9/2019 | 8/12/2019 | 8/12/2019 | A | PASS |
Mike Jordan
|
|
|
Nacho Phone #: ###-####. Interior steel stud framed walls for restroom on mezz. and west vestibule. Also screw pattern for shear walls.
|
BLD-Other | 8/9/2019 | 8/9/2019 | 8/9/2019 | P | PASS |
Mike Jordan
|
|
|
fire wall // nicho Phone #: ###-####. 5/8 sheet rock on underside of decking.
|
BLD-Framing/Rough-in | 8/6/2019 | 8/7/2019 | 8/7/2019 | A | PASS |
Mike Jordan
|
|
|
Nacho Phone #: ###-####. Interior steel stud framed walls, hardlids and mezzanines ok per approved plans and RFI's from engineer of record.
|
BLD-Framing/Rough-in | 7/30/2019 | 7/31/2019 | 7/31/2019 | A | FAIL |
Mike Jordan
|
|
|
Macho Phone #: ###-####. Provide the web stiffeners in joists in restroom in area A. Ok to one side walls only.
|
BLD-Framing/Rough-in | 7/30/2019 | 7/30/2019 | 7/30/2019 | P | PASS |
Mike Jordan
|
|
|
Nacho Phone #: ###-####. Ok to sheet rock bottom of joist only.
|
FIRE-Conference | 7/29/2019 | 7/29/2019 | 7/29/2019 | P | DONE |
Troy Cobbley
|
|
|
We discussed the combustible concealed spaces.
Nacho Phone #: ###-####
|
BLD-Wall cover | 6/13/2019 | 6/13/2019 | 6/13/2019 | P | FAIL |
Mike Jordan
|
|
|
Sheer wall Phone #: ###-#### Inspection requested via web by Steve Mitchell. Interior shear wall next to restroom. Needs to install 5/8" anchor bolts, HDU4 hold down and provide atachment of sheetrock at 4 inches OC
|
BLD-Framing/Rough-in | 6/11/2019 | 6/12/2019 | 6/12/2019 | A | CANC |
Mike Jordan
|
|
|
Framing for break room and bathrooms and sheet rock screw pattern Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Framing/Rough-in | 5/29/2019 | 5/30/2019 | 5/30/2019 | P | PASS |
Mike Jordan
|
|
|
Late after noon West, East, South walls of show room Phone #: ###-#### Inspection requested via web by Steve Mitchell. West exterior wall in showroom ok.
|
BLD-Foundation | 5/23/2019 | 5/24/2019 | 5/24/2019 | A | PASS |
Mike Jordan
|
|
|
Grout under columns. Early A M please thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Concrete | 5/22/2019 | 5/23/2019 | 5/23/2019 | A | CANC |
Mike Jordan
|
|
|
Early A M please. Grout under columns Phone #: ###-#### >> Inspection requested via web by Steve Mitchell Inspection cancelled from web by: Steve Mitchell
|
BLD-Concrete | 4/18/2019 | 4/19/2019 | 4/19/2019 | A | PART |
Brandon Shaw
|
|
|
Grid L-A, Wesr side... Grid A-G, East side...
|
BLD-Concrete | 4/15/2019 | 4/16/2019 | 4/16/2019 | P | PASS |
Mike Jordan
|
|
|
Late after noon slab on grade grids G to K and 1 to 3 Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Concrete | 4/10/2019 | 4/15/2019 | 4/15/2019 | A | CANC |
Mike Jordan
|
|
|
slab on grade grids 1 to 3 and S to DD Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Concrete | 4/12/2019 | 4/12/2019 | 4/12/2019 | P | PASS |
Mike Jordan
|
|
|
Reinforcing slab on grade grids 1 to 3 S to DD Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Concrete | 4/8/2019 | 4/9/2019 | 4/9/2019 | P | CANC |
Mike Jordan
|
|
|
Early after noon. slab on grade grids S to DD,3 thru 6 Phone #: ###-#### Inspection requested via web by Steve Mitchell. rreinforcment for interior slab on grade at above location ok.
|
BLD-Concrete | 3/26/2019 | 3/27/2019 | 3/27/2019 | P | PART |
Mike Jordan
|
|
|
Slab on grade Phone #: ###-#### Inspection requested via web by Steve Mitchell. reinforcemet for interior slab on graded anfd interior thickend footings.on gridlines k to S and gridlines 1 to 6. Noted that dobes need to be installed for rebar at thickend footings.. Special inspector to verify prior to placment.
|
BLD-Footing | 3/19/2019 | 3/20/2019 | 3/20/2019 | A | PART |
Mike Jordan
|
|
|
Early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell. work in progress.
|
BLD-Foundation | 3/8/2019 | 3/11/2019 | 3/11/2019 | A | PASS |
Mike Jordan
|
|
|
Early am please we are scheduled to pore at 10:00 AM Thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell. Frost wall and column pedestals on gridline DD between grids 1 to 6 and remainder of frost walls and column pedestals on gridline 6.
|
BLD-Footing | 3/8/2019 | 3/8/2019 | 3/8/2019 | P | PASS |
Mike Jordan
|
|
|
Exterior column pad footings on grtidlline 7.
|
BLD-Footing | 3/4/2019 | 3/8/2019 | 3/8/2019 | A | CANC |
Mike Jordan
|
|
|
Early AM Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 3/4/2019 | 3/7/2019 | 3/7/2019 | A | CANC |
Mike Jordan
|
|
|
Early AM Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 3/4/2019 | 3/6/2019 | 3/6/2019 | A | CANC |
Mike Jordan
|
|
|
Early AM Phone #: ###-#### >> Inspection requested via web by Steve Mitchell Inspection cancelled from web by: Steve Mitchell
|
BLD-Footing | 3/4/2019 | 3/5/2019 | 3/5/2019 | A | DEFR |
Mike Jordan
|
|
|
Early AM Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/25/2019 | 3/1/2019 | 3/1/2019 | A | DEFR |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell. West service bays frost wall, special inspector on site.
|
BLD-Footing | 2/25/2019 | 2/28/2019 | 2/28/2019 | A | CANC |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/25/2019 | 2/27/2019 | 2/27/2019 | A | CANC |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/25/2019 | 2/26/2019 | 2/26/2019 | A | DEFR |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell. OK pending special inspection.
|
BLD-Footing | 2/18/2019 | 2/22/2019 | 2/22/2019 | A | PASS |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell. Interior column pad footings on grids 2 and 3 between grids n to W. Frost wall on gridline 1 between grids N to CC.
|
BLD-Footing | 2/18/2019 | 2/21/2019 | 2/21/2019 | A | NR |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/18/2019 | 2/20/2019 | 2/20/2019 | A | CANC |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/18/2019 | 2/19/2019 | 2/19/2019 | A | PART |
Mike Jordan
|
|
|
early am Phone #: ###-#### Inspection requested via web by Steve Mitchell. Interior column pad footings on grid line 3, work in progress.
|
BLD-Footing | 2/11/2019 | 2/15/2019 | 2/15/2019 | A | PART |
Jim Sly
|
|
|
early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell Select stem walls....OK pending Geotek special inspection, tests and approvals.
|
BLD-Footing | 2/11/2019 | 2/14/2019 | 2/14/2019 | A | DEFR |
Mike Jordan
|
|
|
early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/11/2019 | 2/13/2019 | 2/13/2019 | A | PART |
Mike Jordan
|
|
|
early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell. Column pad footings on grid 6 between grids W to AA. Work in progress. Needs to install verts. Ok to place concrete pending special inspection.
|
BLD-Footing | 2/11/2019 | 2/12/2019 | 2/12/2019 | A | CANC |
Mike Jordan
|
|
|
early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/2/2019 | 2/8/2019 | 2/8/2019 | A | DEFR |
Brandon Shaw
|
|
|
Work in progress on column pedestals, ok for conc. pending Special inspection... North East corner...
|
BLD-Footing | 2/2/2019 | 2/7/2019 | 2/7/2019 | A | DEFR |
Mike Jordan
|
|
|
Early AM please Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/2/2019 | 2/6/2019 | 2/6/2019 | A | CANC |
Mike Jordan
|
|
|
Early AM please Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/6/2019 | 2/6/2019 | 2/6/2019 | P | DEFR |
Mike Jordan
|
|
|
Conc. placement in progress. Special inspector on site.
|
BLD-Footing | 2/2/2019 | 2/5/2019 | 2/5/2019 | A | CANC |
Mike Jordan
|
|
|
Early AM please Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 2/2/2019 | 2/4/2019 | 2/4/2019 | A | NR |
Mike Jordan
|
|
|
Early AM please Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 1/28/2019 | 2/1/2019 | 2/1/2019 | A | PART |
Mike Jordan
|
|
|
Request early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell. Work in progress on column pedestals and frost walls. ok for conc. pending Special inspection.
|
BLD-Footing | 1/28/2019 | 1/31/2019 | 1/31/2019 | A | PASS |
Mike Jordan
|
|
|
Request early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell. Coloumn pad footings for log canopy ok per Tammarack Grove enginnering RFI.
|
BLD-Footing | 1/28/2019 | 1/30/2019 | 1/30/2019 | A | PASS |
Mike Jordan
|
|
|
Request early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell. exterior column pad footings on gridline 9 for west canopy.
|
BLD-Footing | 1/28/2019 | 1/29/2019 | 1/29/2019 | A | DEFR |
Mike Jordan
|
|
|
Request early am please Phone #: ###-#### Inspection requested via web by Steve Mitchell. Special inspector on site.
|
BLD-Foundation | 1/21/2019 | 1/25/2019 | 1/25/2019 | A | PASS |
Mike Jordan
|
|
|
we would like as early as we can thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell. Frost walls and column pedestals on gridline k and 8.
|
BLD-Foundation | 1/21/2019 | 1/24/2019 | 1/24/2019 | A | PART |
Jim Sly
|
|
|
we would like as early as we can thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell OK.....pending Geotek special inspection, tests and approvals.
|
BLD-Foundation | 1/21/2019 | 1/23/2019 | 1/23/2019 | A | CANC |
Mike Jordan
|
|
|
we would like as early as we can thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Foundation | 1/21/2019 | 1/22/2019 | 1/22/2019 | A | PART |
Jim Sly
|
|
|
we would like as early as we can thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell foundation walls and piers at South side of bldg. OK pending Geotek special inspection, tests and approvals.
|
BLD-Footing | 1/16/2019 | 1/18/2019 | 1/18/2019 | A | PART |
Mike Jordan
|
|
|
Early AM please Phone #: ###-#### Inspection requested via web by Steve Mitchell. column pedestals and frost wall on gridline 1. Column pad footings on gridline 6. Work in progress, special inspector on site. Noted cold weather conc. practices being followed.
|
BLD-Footing | 1/16/2019 | 1/17/2019 | 1/17/2019 | A | DEFR |
Mike Jordan
|
|
|
Requesting early am thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell. Special inspector on site.
|
BLD-Footing | 1/15/2019 | 1/16/2019 | 1/16/2019 | A | PART |
Mike Jordan
|
|
|
We would like an early AM inspection thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell. Interior column pad footings on gridline L. Needs to be following cold weather concrete standard. Special inspector will be on sit and will verify form temps prior to placing concrete.
|
BLD-Footing | 1/14/2019 | 1/15/2019 | 1/15/2019 | A | PART |
Mike Jordan
|
|
|
we would like an early A M inspection on rebar for an after noon pore thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell. Column pad footings for canopy. Per contractor, will be tented and heated, forms will be pre heated with a weed burner. Special inspector on site.
|
BLD-Footing | 1/7/2019 | 1/10/2019 | 1/10/2019 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Steve Mitchell
|
BLD-Footing | 1/8/2019 | 1/9/2019 | 1/9/2019 | A | PASS |
Jim Storey
|
|
|
Request for inspection around 8:00 a.m. if possible. Steve Mitchell Phone #: ###-#### Phone #: ###-#### Inspection requested via web by Jaron Dowalter rebar pad ft ok pending si reports
|
BLD-Footing | 1/8/2019 | 1/8/2019 | 1/8/2019 | P | NH |
Mike Jordan
|
|
|
we would like a inspection around 2:00 this after noon if possible Phone #: ###-#### Inspection requested via web by Steve Mitchell. No access. on site, gates closed and locked. No inspection performed.
|
BLD-Footing | 12/26/2018 | 12/27/2018 | 12/28/2018 | P | PASS |
Dave Hannah
|
|
|
We need a 2:30 inspection of rebar thanks Phone #: ###-#### Inspection requested via web by Steve Mitchell ftgs also spec inspection will be on site
|
BLD-Footing | 12/20/2018 | 12/21/2018 | 12/21/2018 | P | CANC |
Mike Jordan
|
|
|
we will be poring at 2;00 pm with special inspections for rebar Phone #: ###-#### >> Inspection requested via web by Steve Mitchell ***per Steve, cancel inspection. will not be ready today and will call in to reschedule***
|
BLD-Conference | 9/26/2018 | 9/27/2018 | 9/27/2018 | A | DONE |
Mike Jordan
|
|
|
No current permit for excavation and backfill of building footprint area. Current grading permit for parking lots only.. Building footing footprint is completed. Notified K@ project manager and project super to contact Jason Taylor for further direction. Also stop work on building pad. Noted no work on building paad was being conducted while on site. No excavators were on site either.
|