DOC - Permit Finaled | | | 7/19/2019 | | DONE |
|
|
|
inpector 425 out on 6/6/19 and PASS -this should of been DOC final Jim Page notify permit desk.
|
BLD-Final | 6/6/2019 | 6/6/2019 | 6/6/2019 | P | PASS |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Final | 6/4/2019 | 6/5/2019 | 6/5/2019 | A | NR |
Dave Hannah
|
|
|
John- please call for access Phone #: ###-#### needs other trades to final first
|
FIRE-Final Inspection | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Jim Page
|
|
|
No fire alarm modifications for this scope of work, no fire sprinkler modifications for this scope of work, fire extinguishers are in place with current inspection tags. Final life fire safety inspection for this scope of work complete.
John- please call for access Phone #: ###-####
|
BLD-Framing/Rough-in | 4/29/2019 | 4/29/2019 | 4/29/2019 | P | PART |
Dave Hannah
|
|
|
Jon Phone #: ###-#### ceiling grid inhallway ok
|
BLD-Framing/Rough-in | 4/8/2019 | 4/9/2019 | 4/9/2019 | A | PART |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|
BLD-Framing/Rough-in | 3/18/2019 | 3/19/2019 | 3/19/2019 | A | PART |
Dave Hannah
|
|
|
Jon Phone #: ###-#### sheet rock around elec panel ok
|
BLD-Framing/Rough-in | 3/14/2019 | 3/15/2019 | 3/15/2019 | A | PASS |
Dave Hannah
|
|
|
Jon Phone #: ###-####
|