BLD-Final | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Brandon Shaw
|
|
|
Garage code 0206 Phone #: ###-#### Inspection requested via web by Elena Stephens
|
DOC - Permit Finaled | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | PASS |
Brandon Shaw
|
|
|
|
BLD-Blower Door Test Results | 1/11/2019 | 1/11/2019 | 1/11/2019 | P | DONE |
Brandon Shaw
|
|
|
ACH50- 3.75
|
BLD-Energy code compliance | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Jim Sly
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 10/22/2018 | 10/22/2018 | 10/22/2018 | P | PASS |
Jim Sly
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Framing/Rough-in | 10/18/2018 | 10/19/2018 | 10/19/2018 | A | NR |
Jim Sly
|
|
|
Inspection requested via web by Marc Foote Verified Foam Seal.......Contr. left no phone #...... Wanted to call..........
|
BLD-Framing/Rough-in | 10/17/2018 | 10/17/2018 | 10/17/2018 | P | PART |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote c/n d1 not bearing on mlb/ tpo chord drilled by hvac at flue/ need air seal
|
BLD-Wall Bracing | 10/1/2018 | 10/1/2018 | 10/1/2018 | P | PASS |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote aprox.300 301
|
BLD-Wall Bracing | 9/28/2018 | 10/1/2018 | 10/1/2018 | A | DEFR |
Jim Storey
|
|
|
Inspection requested via web by Marc Foote
|
BLD-Footing | 8/22/2018 | 8/22/2018 | 8/22/2018 | P | PASS |
Jim Storey
|
|
|
Jared Phone #: ###-####
|