Information based on query as of Friday, May 17, 2024.
Permit Information
Permit NumberBLD18-02286
StatusFinaled
Name DOUG LASHER CONSTRUCTION
Site Address 1803 N MOCKBEE PL
Project Name 
Customer Number 
ePlanReviewNo
Description
FIRE SPRINKLERS REQUIRED PER BFD MEMO. HILLSIDE, WUI FOOTHILLS, ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. Permit for the construction of a new 3439 sq. ft., two story (first story 2110 sq. ft., basement 1329 sq. ft.) single family dwelling with 4 bedrooms, 3 bathrooms, approximately 439 sq. ft. of covered patio/porch and a 781 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1B zoning and setbacks per planning. REScheck provided for Energy compliance. ***BJM***

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Blower Door Test Results1/9/20191/9/20191/9/2019PPASS
DetailsDave Hannah
4.0
BLD-Final1/9/20191/9/20191/9/2019PPASS
DetailsDave Hannah
A bond will be completed early this morning for the landscaping/ hillside. Tisha should have all the info. Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch ***bond have been recorded. blh ###-####*** blower door 4.0
DOC - Permit Finaled1/9/20191/9/20191/9/2019PPASS
DetailsDave Hannah
BLD-Final1/7/20191/8/20191/8/2019PNR
DetailsDave Hannah
Garage code 1905 Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Final1/4/20191/4/20191/4/2019PCANC
DetailsTony Young
Fire should pass after lunch Phone #: ###-#### >> Inspection requested via web by bryan murdoch Inspection cancelled from web by: bryan murdoch
BLD-Energy code compliance10/15/201810/16/201810/16/2018APASS
DetailsTony Young
Phone #: ###-#### Inspection requested via web by bryan murdoch
BLD-Framing/Rough-in10/12/201810/12/201810/12/2018PPASS
DetailsBrandon Shaw
Corrections SAT...

OK to insulate
BLD-Framing/Rough-in10/9/201810/9/201810/9/2018PCANC
DetailsBrandon Shaw
Previous inspection entry should be Fail, not Cancel.
BLD-Framing/Rough-in10/9/201810/9/201810/9/2018PCANC
DetailsBrandon Shaw
Need straps at breaks in double top plates...
Provide continuous bearing to footing for 3 ply beam, supporting 3 ply box truss, up stairs hallway...
Need air/foam seal...
See red paint
BLD-Wall Bracing10/9/201810/9/201810/9/2018PPEND
DetailsBrandon Shaw
Interior shear to be as per plans...

See red paint
BLD-Wall Bracing10/2/201810/3/201810/3/2018APART
DetailsJim Storey
Can you also please do a courtesy framing inspection while you were there so we can fix any items that may need to be done thank you Phone #: ###-#### Inspection requested via web by bryan murdoch exterior ok
BLD-Foundation8/9/20188/9/20188/9/2018PDONE
DetailsDave Hannah
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Foundation8/8/20188/8/20188/8/2018PPART
DetailsMike Jordan
As late as possible Phone #: 2089495359 >> Inspection requested via mobile web by Ricardo. Basement walls ok. Noted footing on garage foundation had vertical reinforcement at 4ft. oc. Approved plans and engineering shows verts at 18 inches oc. Spoke to Kaleb Jones with Performance engineers, he noted that 4ft. verts in this area only is ok. Kaleb to send me new deatl with his stamp showing this.
BLD-Footing8/2/20188/2/20188/2/2018APASS
DetailsBrandon Shaw
Work in progress