BLD-Final | 7/2/2019 | 7/3/2019 | 7/3/2019 | A | PASS |
Tell Riley
|
|
|
Jeff Phone #: ###-####//penetratjions have been caulked//final complete///
|
DOC - Permit Finaled | 7/3/2019 | 7/3/2019 | 7/3/2019 | P | PASS |
Tell Riley
|
|
|
|
BLD-Final | 7/1/2019 | 7/2/2019 | 7/2/2019 | A | FAIL |
Tell Riley
|
|
|
Jeff Phone #: ###-####//need to seal fire sprinkler riser and conduits at penetration through ceiling in mechanical area//
|
BLD-Final | 6/26/2019 | 6/27/2019 | 6/27/2019 | P | FAIL |
Tell Riley
|
|
|
Phone #: ###-#### Inspection requested via web by SHERRY BIDDLE//obtain HVAC final inspection//Obtain ESC final inspection//seal penetrations through ceiling at fire sprinkler riser in mechanical area//
|
BLD-Framing/Rough-in | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Jim Sly
|
|
|
framing and insulation // Mark Phone #: ###-#### FRAME AND ENERGY>>>>PASS
|
FIRE-Sprinkler Rough-in | 3/4/2019 | 3/4/2019 | 3/4/2019 | P | PASS |
Troy Cobbley
|
|
|
Sprinkler piping is ok for cover.
|
BLD-Framing/Rough-in | 2/25/2019 | 2/27/2019 | 2/27/2019 | A | PASS |
Jim Sly
|
|
|
Sherrie-fire permit was pulled see FIR19-00117 Phone #: ###-#### Framing OK except for 2 straps a portal frame. Need sprinkler rough in approval.
|
BLD-Conference | 1/10/2019 | 1/10/2019 | 1/10/2019 | P | CANC |
Jim Sly
|
|
|
|
BLD-Wall Bracing | 12/6/2018 | 12/6/2018 | 12/6/2018 | P | PASS |
Jim Sly
|
|
|
Jeff Phone #: ###-####
|
BLD-Foundation | 10/17/2018 | 10/18/2018 | 10/18/2018 | A | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/16/2018 | 10/17/2018 | 10/17/2018 | A | PART |
Mike Jordan
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/14/2018 | 10/15/2018 | 10/15/2018 | P | NR |
Brandon Shaw
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 10/1/2018 | 10/1/2018 | 10/1/2018 | A | PASS |
Brandon Shaw
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|