BLD-Final | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
tim Phone #: ###-####
|
DOC - Permit Finaled | 6/4/2019 | 6/4/2019 | 6/4/2019 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/3/2019 | 6/3/2019 | 6/3/2019 | P | PEND |
Dave Hannah
|
|
|
Tim- please call for access Phone #: ###-#### needs site plan and blower door test
|
BLD-Conference | 4/18/2019 | 5/9/2019 | 5/9/2019 | P | CANC |
Jim Sly
|
|
|
Check back........ Under review.....
|
BLD-Conference | 4/12/2019 | 4/18/2019 | 4/18/2019 | P | DONE |
Jim Sly
|
|
|
Check on progress.... Same......no humans....no activity. C/N Conditioning of "unheated" storage space on main floor, not per approved plan. Contact Boise City for plan modification. 2nd notice.
|
BLD-Conference | 4/11/2019 | 4/12/2019 | 4/12/2019 | A | DONE |
Jim Sly
|
|
|
Issue CN to provide a plan modification to plan review for modifications made to structure. C/N posted on window.
|
BLD-Energy code compliance | 12/19/2018 | 12/19/2018 | 12/19/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Lewis
|
BLD-Framing/Rough-in | 12/17/2018 | 12/18/2018 | 12/18/2018 | A | PART |
Jim Sly
|
|
|
Phone #: ###-#### Inspection requested via web by Brian Lewis C/N posted.....fireblock HVAC chase.
|
BLD-Wall Bracing | 10/31/2018 | 11/1/2018 | 11/1/2018 | A | PASS |
Jim Sly
|
|
|
Louis Phone #: ###-####
|
BLD-Wall Bracing | 10/30/2018 | 10/31/2018 | 10/31/2018 | A | NR |
Jim Sly
|
|
|
shear // Leuis Phone #: ###-####
|
BLD-Foundation | 9/19/2018 | 9/19/2018 | 9/19/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 9/18/2018 | 9/18/2018 | 9/18/2018 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|