Information based on query as of Saturday, May 18, 2024.
Permit Information
Permit NumberBLD18-02540
StatusIssued
Name KING BUILDING & REMODELING
Site Address 123 W CRESTLINE DR
Project NameHormaechea Remodel
Customer Number 
ePlanReviewYes
Description
Full gut-to-the-stud remodel and addition that adds 1,040sq' of living space and 490sq' of a garage. Final home is 4bd/3.5bth. All work per plans, notes, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**


A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Energy code compliance11/13/201811/14/201811/14/2018APASS
DetailsDave Hannah
Lynn Phone #: ###-####
BLD-Framing/Rough-in11/5/201811/6/201811/6/2018APASS
DetailsTony Young
John Phone #: ###-####
BLD-Framing/Rough-in10/31/201811/1/201811/1/2018APEND
DetailsBrandon Shaw
Framing good to go...
Foam/air seal to be done before spray foam installation, call air seal...
BLD-Wall Bracing10/16/201810/17/201810/17/2018APASS
DetailsTony Young
Ren Phone #: ###-####
BLD-Foundation8/27/20188/27/20188/27/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jon King,, work in progress
BLD-Footing8/20/20188/20/20188/20/2018PPART
DetailsTony Young
Phone #: ###-#### Inspection requested via web by Jon King,, work in progress,, ok