Information based on query as of Sunday, May 12, 2024.
Permit Information
Permit NumberBLD18-02642
StatusFinaled
Name HHS CONSTRUCTION LLC
Site Address 5509 E HOOTOWL DR
Project NameCottonwood HN 36-1
Customer Number 
ePlanReviewYes
Description
Permit for the construction of a new 3013 sq. ft., one story single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 546 sq. ft. of covered patio/porch and a 824 sq. ft. attached garage per the approved plans, notations, local codes & ordinances. SP-01 zoning and setbacks per planning. **JAB**

A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Melissa Jannusch at 208-608-7168.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final.

An erosion and sediment control site preparation inspection is required for this site. The site preparation inspection takes place after all required erosion and sediment control best management practices have been installed and BEFORE any earthwork takes place. Call 208-608-7070 to schedule an inspection.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/25/20191/25/20191/25/2019PPASS
DetailsBrandon Shaw
Phone #: ###-#### Inspection requested via web by Kyle Seick
DOC - Permit Finaled1/25/20191/25/20191/25/2019PPASS
DetailsBrandon Shaw
BLD-Blower Door Test Results1/25/20191/25/20191/25/2019PDONE
DetailsBrandon Shaw
ACh50- 4.13
BLD-Final1/24/20191/24/20191/24/2019ANR
DetailsBrandon Shaw
Need PLM final
BLD-Other11/19/201811/19/201811/19/2018PPASS
DetailsJim Sly
Soffits.......OK
BLD-Other11/19/201811/19/201811/19/2018PCANC
DetailsJim Sly
Soffit Inspection Phone #: ###-#### Inspection requested via web by Kyle Seick
Soffit....OK.
BLD-Energy code compliance11/15/201811/16/201811/16/2018APASS
DetailsJim Sly
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD-Framing/Rough-in11/13/201811/13/201811/13/2018PPART
DetailsBrandon Shaw
As per plans, (2) 9 1/2 LVL required at interior bearing wall- Master bath/closet...
Provide straps at break in double plates at interior bearing walls...
See red paint
OK to insulate
BLD-Wall Bracing10/26/201810/26/201810/26/2018PPASS
DetailsBrandon Shaw
Corrections SAT...
BLD-Wall Bracing10/23/201810/24/201810/24/2018AFAIL
DetailsBrandon Shaw
Hold downs to be as per plans- H7 w/ 2"x2" washer not installed at kitchen/dining area...
House wrap installed prior to inspection- remove to verify nailing at hold downs and garage ...
Edge nailing and blocking to be as per plans...
See red paint
BLD-Foundation9/25/20189/25/20189/25/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Foundation9/24/20189/24/20189/24/2018PNR
DetailsBrandon Shaw
No one on site at time of inspection
BLD-Footing9/20/20189/20/20189/24/2018PCANC
DetailsAdele J Schaffeld-Griffin
Inspection cancelled via mobile web on Monday, September 24, 2018.
BLD-Footing9/20/20189/20/20189/20/2018PPASS
DetailsBrandon Shaw
Work in progress
BLD-Footing9/20/20189/20/20189/20/2018ANR
DetailsBrandon Shaw
Need subgrade submitted and approved by PW...
BLD-Conference9/20/20189/20/20189/20/2018PCANC
DetailsBrandon Shaw
As late as possible Phone #: 2084207023 >> Inspection requested via mobile web by Dion Connell Inspection cancelled via mobile web on Thursday, September 20, 2018.