BLD-Final | 8/28/2018 | 8/31/2018 | 8/30/2018 | P | PASS |
Tony Young
|
|
|
Josh Phone #: ###-####
|
BLD-Final | 8/22/2018 | 8/28/2018 | 8/28/2018 | A | PART |
Tony Young
|
|
|
Josh Phone #: ###-####,, ok pending drawing as built approval from plan review
|
BLD-Final | 8/14/2018 | 8/15/2018 | 8/15/2018 | A | FAIL |
Brandon Shaw
|
|
|
Exit corridors/pathways to remain unobstructed at all times... Electrical panels to be unobstructed at all times... Hot water heater/storage mezzanine, long term storage only... Replace Exit sign at bathroom/s hallway, North side of assembly area... ADA lift egress path to remain clear at all times... Submit revise plans, for review, showing door and direction of swing, at Bridal room bathroom...
|
FIRE-Final Inspection | 8/14/2018 | 8/14/2018 | 8/14/2018 | P | PASS |
Jim Page
|
|
|
No fire sprinkler modifications, no fire alarm modifications, fire extingushers are placed throughout with current inspection tags. Final life fire safety inspection complete.
Josh-call to meet Phone #: ###-####
|