Information based on query as of Thursday, May 16, 2024.
Permit Information
Permit NumberBLD18-02903
StatusFinaled
Name SEAN CAFFERTY ENTERPRISES
Site Address 1617 N CLAREMONT DR
Project NameDuckworth remodel
Customer Number 
ePlanReviewNo
Description
ENGINEERED STAIR DETAIL PROVIDED **jab** WUI - SPECIAL INSPECTIONS - Permit to begin the structural work on this home. At completion this home is 4bd/4bth. 434sq' of new conditioned space is being added to the home. The interior work is extensive. The exterior decks get rebuilt. There will be deferred engineering submittals for the steel stairs. All work per plans, notations, attachments, engineering, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Please e-mail the stamped inspection approval letter to mjannusch@cityofboise.org and allow 24 hours for subgrade approval processing. Call Melissa Jannusch at 208-608-7168 with questions.

The final inspection of the site grading and drainage work shall be done by the design engineer. Written approval shall be submitted to Boise Public Works prior to the issuance of the building final. 11-30-18 **JAB** - - - Permit for a full-gut interior remodel that reconfigures some non-bearing walls. Final project is 4bd/4bth. All work per plans, notations, local codes & ordinances. Separate electrical, plumbing & mechanical permits required. **JAB**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/8/20204/8/20204/8/2020PPASS
DetailsBrandon Shaw
Justin **cleared** Phone #: ###-####
DOC - Permit Finaled4/8/20204/8/20204/8/2020PPASS
DetailsBrandon Shaw
BLD-Final3/27/20203/27/20203/27/2020PPART
DetailsJim Storey
sean Phone #: ###-#### bld insp. ok for occupance/ bond app. in works
BLD-Conference3/17/20203/18/20203/18/2020APASS
DetailsJim Storey
Justin Phone #: ###-####
BLD-Framing/Rough-in10/3/201910/4/201910/4/2019APASS
DetailsBrandon Shaw
Garage only // Justin Phone #: ###-####
BLD-Energy code compliance7/22/20197/23/20197/23/2019APASS
DetailsBrandon Shaw
Justin Phone #: ###-####
BLD-Framing/Rough-in6/27/20196/28/20196/28/2019APART
DetailsTony Young
house only- Justin Phone #: ###-####,, fire block with rock wool ok,, verify at energy inspection,, ok to insulate
BLD-Framing/Rough-in6/11/20196/12/20196/12/2019APART
DetailsTony Young
Justin Cafferty - Partial framing inspection Phone #: ###-####,,, soffits ok to cover
BLD-Conference6/4/20196/5/20196/5/2019APART
DetailsTony Young
Justin Phone #: ###-####,, ?s on fireplace,, measure from firebox brick
BLD-Energy code compliance5/9/20195/10/20195/10/2019APART
DetailsTony Young
Partial energy on soffits - Sean ###-####,, soffits with living above insulation ok,, spray foam,, ok to cover with rated material
BLD-Framing/Rough-in5/3/20195/7/20195/7/2019APART
DetailsDave Hannah
Justin-partial on lower soffits to cover Phone #: ###-#### ok all but for lagger needs to have lags screws added
BLD-Wall Bracing3/18/20193/19/20193/19/2019APASS
DetailsTony Young
shear // justin Phone #: ###-####,, mostly existing and moment frame,, per Dean Briggs engineer
BLD-Footing12/12/201812/12/201812/12/2018PPASS
DetailsBrandon Shaw
Work in progress...
Frost protection is required...